My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022/08/03 Council Agenda Packet
>
Council Agenda Packets
>
2022
>
2022/08/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2023 4:34:15 PM
Creation date
8/4/2022 11:21:01 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br />Washington State <br />Vl Department of Transportation <br />Supplemental <br />Number <br />1 <br />Organization <br />3200 <br />Phone: <br />City <br />of <br />Cedar <br />425-257-8800 <br />Everett <br />and <br />St, <br />Address <br />Public <br />Everett, <br />Works <br />WA <br />98201 <br />Department <br />Agreement <br />Original <br />EBR-3694 <br />Agreement <br />Number <br />Project <br />BRM-2776(009) <br />Number <br />Execution <br />Date <br />Completion <br />12/31/2026 <br />Date <br />1/31/2020 <br />Project <br />EDGEWATER <br />Title <br />BRIDGE <br />New <br />$3,509,212 <br />Maximum <br />Amount <br />Payable <br />Descnption <br />demand <br />The <br />The <br />The <br />bridge <br />additional <br />existing <br />load <br />of <br />Work <br />facility <br />structure <br />bearing <br />capacity. <br />is <br />to <br />a <br />have <br />provide <br />functionally <br />(2) <br />The <br />12-foot <br />new <br />Construction <br />obsolete <br />replacement <br />lanes, <br />structure <br />will <br />shoulders <br />that <br />be <br />approximately <br />is <br />deficient <br />and <br />Services. <br />(2) <br />in <br />375 <br />6.5-foot <br />both <br />shear <br />feet <br />sidewalks. <br />long <br />and <br />and <br />deck <br />49 <br />design <br />feet <br />wide. <br />work <br />will <br />is <br />(2) <br />Phase <br />5-foot <br />Engineering <br />The Local Agency of City of Everett <br />desires to supplement the agreement entered in to with Trantech Rngjneering <br />and executed on 1/31/2020 and identified as Agreement No EBR-3694 <br />All provisions in the basic agreement remain in effect except as expressly modified by this supplement. <br />The changes to the agreement are described as follows: <br />1 <br />S ection 1, SCOPE OF WORK, is hereby changed to read. <br />See Exhibit A Attachment for additional scope of work which include Construction Phase Engineering <br />Services. <br />11 <br />S ection IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days <br />for completion of the work to read' 12/31/2026 <br />III <br />S ection V, PAYMENT, shall be amended as follows: <br />The current contract amount of $1,803,078 is supplemented for an additional $1,706,134 for a new maximum <br />payable amount of $3,509,212 as presented in Exhibit B <br />as set forth in the attached Exhibit Al and by this reference made a part of this supplement. <br />If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate <br />spaces below and return to this office for final action. <br />By: Trantech Engineering By* Cassie Franklin, Mayor <br />Consultant Signature Approving Authority Signature <br />Date <br />DOT Form 140-063 <br />Revised 09/2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.