My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-07.5 Environmental Regulations <br /> ' 1-07.5(4) Air Quality <br /> Delete all of 1-07.5(4) and substitute the following: <br /> The Contractor shall comply with all rules of the Puget Sound Clean Air Agency <br /> (PSCAA) (800-552-3565). These rules include PSCAA Regulation I. Excerpts of <br /> Regulation I are included in the Appendix D as it relates to fugitive dust control. The <br /> Contractor shall submit a dust control plan including dust control measures for its <br /> ' activities related to this Contract that may cause dust. This plan shall be submitted <br /> to the Engineer prior to commencing activity at the job site. <br /> 1-07.6 Permits and Licenses <br /> Supplement 1-07.6 by adding the following: <br /> A City of Everett business license is required for the Contractor and the Contractor's <br /> Subcontractors prior to commencing construction on this Contract. <br /> Contractor shall obtain all necessary permits required by law and the City of Everett. <br /> All general building, electrical, plumbing permits will be issued at no cost to the <br /> Contractor. In addition, obtain all required permits for waste disposal sites. Waste <br /> disposal sites shall be in the United States, unless otherwise expressly stated in the <br /> Contract Documents or the City gives prior written approval. <br /> This Project has more than one acre of total disturbed area within the project limits <br /> ' and requires coverage under the Construction Stormwater General Permit <br /> (CSWGP). The City has obtained coverage for the project in order to facilitate the <br /> project schedule. A copy of the permit and coverage letter is included in Appendix <br /> {???} The Contractor shall assume responsibility for the requirements of the <br /> CSWGP by filing a Transfer of Coverage form with Ecology, developing a <br /> Construction Stormwater Pollution Prevention Plan (SWPPP) prior to beginning <br /> construction, and complying with the requirements of the permit. Criteria and <br /> ' requirements for developing a SWPPP can be found in Volume II of the 2014 <br /> Ecology Manual. A link to the Manual can be found on the City's web site using the <br /> following URL: <br /> ' https://www.everettwa.gov/672/Stormwater-Management-Manual <br /> Contact Ecology to determine if other requirements apply to the Project. <br /> NW Region DOE phone: 425-649-7000 <br /> Include all cost incurred for obtaining the CONSTRUCTION STORMWATER <br /> GENERAL PERMIT in appropriate bid item or items as no direct compensation <br /> will be made. <br /> This Project contains less than one acre of total disturbed area within the project <br /> limits and does not require Contractor to apply for Ecology's Construction <br /> Stormwater General Permit. <br /> ' 1-07.9 Wages <br /> 1-07.9(1) General <br /> Delete the first paragraph of 1-07.9(1) and substitute the following: <br /> ' This Contract is subject to the minimum wage requirements of RCW 39.12 and to <br /> RCW 48.28, as amended or supplemented. Workers shall receive no less than the <br /> prevailing rate of wage. Bidder shall use the Washington State Prevailing Wage <br /> Rates for Snohomish County, effective at the time of bid opening. Bidder is solely <br /> responsible to use the schedule in effect at the Bid Opening Date, determine the <br /> appropriate labor classification(s), and use the appropriate and correct prevailing <br /> Water Main Replacement"W" Division 1 —GENERAL REQUIREMENTS April,2022 <br /> WO No.—UP3766 SP—77 <br />
The URL can be used to link to this page
Your browser does not support the video tag.