My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> qualified scheduler to the City for approval no later than the pre-construction <br /> conference. <br /> 1-08.3(2)B Baseline Schedule <br /> The progress schedule submitted to the City's Representative and City after their <br /> review of the Preliminary Schedule shall be the Baseline Schedule. The Baseline <br /> ' Schedule shall be the baseline schedule against which all future schedules are <br /> compared and updated, and job progress is measured. The Baseline Schedule <br /> shall not be reset or changed without the written agreement of City's Representative <br /> ' and City. <br /> 1-08.3(2)C Updates <br /> Contractor shall submit with each application for payment or progress pay estimate <br /> an updated progress schedule, but no less often than monthly. If requested by <br /> City's Representative or the City, Contractor shall prepare and submit updated <br /> progress schedules from time to time, which may be more frequent than monthly. <br /> An updated progress schedule shall identify progress of the Project or Work to the <br /> date of submission. It shall include, but not be limited to: (1) identification of all <br /> actual start and completion dates occurring prior to the submission of the schedule; <br /> ' (2) comparison of actual start and completion dates to the planned start and <br /> completion dates shown on the Baseline Schedule; and (3) comparison of expected <br /> start and completion dates for work to occur after submission updated progress <br /> ' schedule to the planned start and completion dates shown on the Baseline <br /> Schedule. Work remaining to be completed at the end of a period for an activity <br /> should show the remaining duration required to complete that activity. The percent <br /> complete for that activity should also be shown. If during the course of construction <br /> the Contractor desires or feels it necessary to make changes in the schedule logic, <br /> these changes should be identified, highlighted, and specifically and expressly <br /> brought to the attention of the City's Representative and City along with the <br /> schedule update. <br /> An updated progress schedule shall show changes occurring since submission of <br /> the previous updated progress schedule such as: <br /> ' 1. Major changes in scope; <br /> 2. Activities modified since previous submission; <br /> ' 3. Revised projection for construction completion, as applicable; and <br /> 4. Any other changes. <br /> Contractor shall submit an updated progress schedule for review by the City and <br /> City's Representative, at the weekly construction meeting or as otherwise as <br /> requested by City's Representative or City. Any deviation from the Baseline <br /> Schedule shall be explained by the Contractor, including the cause and effect of the <br /> ' deviation. Contractor shall state in writing the corrective measures it will take to <br /> bring the progress of the Work back in line with the Baseline Schedule. <br /> Once an actual start or completion date is stated in a submitted progress schedule, <br /> Contractor shall not change schedule without prior written agreement of the City <br /> and City's Representative. <br /> With each submitted updated progress schedule, Contractor shall provide a written <br /> narrative report that identifies anticipated or actual deviations from the Baseline <br /> Schedule, causes of the deviations, and the impact of the deviations on the <br /> schedule and describes the corrective action taken or proposed, and its effect. <br /> Water Main Replacement"W" Division 1 —GENERAL <br /> p REQUIREMENTS April, 2022 <br /> WO No.—UP3766 SP—95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.