My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Equipment and material shall be suitably and safely stored at the site of the Work. <br /> Payment requests shall summarize accepted operating and maintenance material with <br /> request for Equipment payment. , <br /> A progress payment is preliminary only. By making a progress payment, the City does <br /> not waive or release its right, nor is it estopped from asserting, that previous progress <br /> payments were not earned or were in error, whether in whole or in part. I <br /> 1.09.9(2) Review Procedures <br /> The City's Representative will review the estimate and either indicate in writing to the <br /> City his or her concurrence with the estimate and his or her recommendation that <br /> payment be made, or indicate in writing to the Contractor his or her reasons for not <br /> concurring with the estimate. If the City's Representative recommends payment and the <br /> City concurs, the City will pay the Contractor a progress payment on the basis of the <br /> approved partial payment estimate, less retainage and any amounts the City may <br /> withhold pursuant to Contract or law. The recommendation of the City's Representative <br /> is not conclusive, final or binding upon the City. <br /> In the event the City's Representative does not concur with the estimate, the Contractor <br /> may make the changes necessary to obtain the City's Representative's concurrence and <br /> resubmit the partial payment estimate, or submit the original progress payment estimate <br /> directly to the City, indicating in writing its reasons for refusing to make the changes <br /> necessary to obtain concurrence. <br /> 1-09.9(3) Withholding Payment <br /> The City's Representative may refuse to recommend the whole or any part of any <br /> payment if in the City's Representative's opinion it would be incorrect to make such <br /> recommendation to the City. The City's Representative may also refuse to recommend <br /> any such payment, or because of subsequently discovered evidence or the result of <br /> tests, may nullify any such payment previously recommended to such extent as may be <br /> necessary in the City's Representative's opinion to protect the City from loss as a result <br /> of: <br /> 1. Defective or damaged Work. <br /> 2. A deductive Change Order. <br /> 3. Persistent failure of the Contractor to perform the Work in accordance with <br /> the Contract Documents, including failure to maintain the progress of the <br /> Work in accordance with the construction schedule. Persistent failure to <br /> maintain the progress of the Work shall mean that for a period of two <br /> consecutive months following a written notice from the City's Representative <br /> or City, the Contractor fails to correct a behind-schedule condition at a rate <br /> that would reasonably indicate that it will finish the Project on schedule. <br /> 4. Disregard of authority of the City or City's Representative or the laws of any <br /> public body having jurisdiction. <br /> 5. Liquidated damages. <br /> 6. Misrepresentation of the quality of materials or Equipment installed or amount <br /> of Work performed. <br /> 7. Discovery that a previous pay estimate erred with respect to the amount of <br /> Work performed or Equipment or materials installed, irrespective of the City's <br /> Representative's recommendation at the time of the progress pay estimate. <br /> The City may refuse to make payment of the full amount recommended by the City's <br /> Representative because of Contract Claims made against the City on account of <br /> Contractor's performance or furnishing the Work or because of liens filed in connection ' <br /> Water Main Replacement"W" Division 1 —GENERAL REQUIREMENTS April, 2022 <br /> WO No.—UP3766 SP—114 <br />