My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> adequate facilities acceptable to the City for the audit during normal business <br /> hours. The Contractor and all Subcontractors shall cooperate with the City's <br /> auditors. <br /> 23. Correspondence, notes, and memoranda. <br /> 24. Job diaries. <br /> 25.All documents which relate to each and every claim together with all <br /> documents which support the amount of damages as to each claim. <br /> 1-09.13 Claims Resolution <br /> Delete all of 1-09.13 and substitute the following: <br /> Prior to seeking claim resolution through litigation, the Contractor shall proceed under <br /> the procedures in Sections 1-04.5 and 1-09.11 and elsewhere in the Contract <br /> Documents for resolution of disputes. These must be complied with in full, as a condition <br /> precedent, to the Contractor's right to seek claim resolution through litigation. <br /> Supplement Section 1-09 by adding the following: <br /> 1-09.14 Patents and Royalties <br /> (******) <br /> Should the Contractor, its agent, employee or any of them be enjoined from furnishing or <br /> using any invention, article, material or plans supplied or required to be supplied or used <br /> under this Contract, Contractor shall promptly pay such royalties and secure requisite <br /> licenses; or, subject to acceptance by City, substitute other articles, materials, or appliances <br /> in lieu thereof that are of equal efficiency, quality, finish, suitability and market value to those <br /> planned or required under the Contract. Descriptive information of these substitutions shall <br /> be submitted to the City's Representative for determination of general conformance to the <br /> design concept and the construction Contract. Should City elect to refuse the substitution, <br /> Contractor agrees to pay such royalties and secure such valid licenses as may be requisite <br /> for the City, its officers, agents and employees or any of them, to use such invention, article, <br /> material or appliance without being disturbed or in any way interfered with by any proceeding <br /> in law or equity on account thereof. <br /> Costs involved in fees, royalties, or claims for any patented invention, article, process or <br /> method that may be used upon or in a manner connected with the Work under this Contract <br /> or with use of completed Work by the City shall be paid by the Contractor. The Contractor <br /> and its sureties shall protect and hold the City, and City's Representative, together with its <br /> officers, agents, and employees, harmless from any and all loss, defense cost, and expenses <br /> and against any and all demands made for such fees or claims brought or made by the holder <br /> of any invention or patent. Before final payment is made on the account of this Contract, the <br /> Contractor shall, if requested by the City, furnish acceptable proof of a proper release from <br /> all such fees or claims. <br /> 1-10 TEMPORARY TRAFFIC CONTROL <br /> 1-10.1 General <br /> 1-10.1(2) Description <br /> Supplement 1-10.1(2) as follows: <br /> The Contractor shall provide a uniformed off-duty Police Officer to control traffic for <br /> work at signalized intersections and other critical situations as determined by the <br /> Engineer. <br /> 1-10.2 Traffic Control Management <br /> 1-10.2(1) General <br /> Delete the first sentence of the third paragraph of 1-10.2(1) and substitute the following: <br /> Water Main Replacement"W" Division 1 —GENERAL REQUIREMENTS April, 2022 <br /> WO No.—UP3766 SP—127 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.