My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> The primary and alternate TCS shall be certified as worksite traffic control <br /> supervisors by one of the organizations listed below: <br /> • Evergreen Safety Council (800) 521-0778 <br /> • Northwest Laborers Union (800) 240-9112 <br /> • American Traffic Safety Services Association (877) 642-4637 <br /> 1-10.2(2) Traffic Control Plans <br /> Delete the first paragraph of 1-10.2(2) and substitute the following: <br /> Contractor may use City's Standard Traffic Control Plans included in COE Standard <br /> Drawings, Series 700 and traffic control plans included in the contract drawings. <br /> The City does not represent or warrant that the Standard Plans are sufficient, <br /> adequate or complete for the Contractor's means, methods or plan of Work. If a <br /> new or additional Traffic Control Plan is necessary, prepare detailed Traffic Control <br /> Plan complying with COE Standard Drawings, Series 700, the MUTCD, Part 6, and <br /> the most current edition of the PROWAG (Public Rights-of-Way Accessibility <br /> Guidelines). Plan preparation shall be at Contractor's sole cost and submitted to <br /> the City for approval at least 14 calendar days before starting Work. Work may not <br /> begin until Contractor is in receipt of City approved Traffic Control Plan. <br /> 1-10.3 Traffic Control Labor, Procedures and Devices r <br /> Delete 1-10.3 and substitute the following: ■ <br /> 1-10.3 Flagging, Signs, and All Other Traffic Control Devices <br /> (******) <br /> 1-10.3(1) General <br /> The Contractor shall provide all flaggers, signs and other traffic control devices. The <br /> Contractor shall erect and maintain all construction signs, warning signs, detour signs, <br /> and other traffic control devices necessary to warn and protect the public at all times <br /> from injury or damage as a result of the Contractor's operations that may occur on <br /> highways, roads, or streets. No Work shall be done on or adjacent to the roadway until <br /> all necessary signs and traffic control devices are in place. <br /> Flaggers and spotters shall possess a current flagging card issued by the State of <br /> Washington, Oregon, Montana, or Idaho. The flagging card shall be immediately <br /> available and shown upon request by the City. <br /> 1-10.3(2) Maintenance and Protection of Traffic Control <br /> When the Bid proposed includes an item for "Maintenance and Protection of Traffic <br /> Control", the Work required for this item shall be to: <br /> 1. Furnish and maintain signs, cones, barricades, flasher, and other <br /> channelization devices; <br /> 2. Provide supervisory personnel for all labor for traffic control; <br /> 3. Provide labor and necessary vehicle(s) for set-up and removal of construction I <br /> signs and the traffic control devices that are placed daily; <br /> 4. Provide labor and vehicles for patrolling and maintaining in position all of the <br /> construction signs and the traffic control devices; <br /> 5. Provide labor, material, and equipment necessary for cleaning up, removing <br /> and replacing all construction signs and traffic control devices that are <br /> destroyed, damaged or lost during the life of the project; <br /> 6. Provide flagging or use of police officers for the convenience of the <br /> Contractor, such as facilitating movement of equipment on the site, laying out <br /> or relocating traffic control devices and signs. I <br /> Water Main Replacement"W" Division 1 —GENERAL REQUIREMENTS April,2022 <br /> WO No.—UP3766 SP—128 <br />
The URL can be used to link to this page
Your browser does not support the video tag.