I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION B - BID ITEM DESCRIPTIONS <br /> Bid Item 1 - Mobilization <br /> Measurement and Payment: Lump Sum (LS) <br /> The lump sum bid for mobilization shall constitute complete compensation for all of <br /> Contractor's preconstruction costs of preparatory work and operations including, but not <br /> limited to, those necessary for the movement of the Contractor's personnel, equipment, <br /> supplies and incidentals to the Project; for the establishment of its offices, buildings and <br /> other facilities necessary for Work on this Project; for premiums on bonds and insurance for <br /> the Project, and for Work and operations that the Contractor must perform or costs it must <br /> incur before beginning production work on the various items on the Project. Mobilization <br /> also includes, but is not limited to, posting construction identification signs, securing <br /> permits, establishing safety and security measures, preparing a traffic control plan(s), <br /> preconstruction photographs, developing a Schedule of Values for lump sum bid items, <br /> submitting the project schedule and providing product and material submittals. Also include <br /> mobilization costs for all subcontracted work along with all costs for utility coordination <br /> noted on the Plans and in the Specifications. <br /> Items not included in this item include, but are not limited to: <br /> (a) Work covered by a specific bid item or Work that is to be included in a bid item <br /> or items. <br /> (b) Profit, interest on borrowed money, overhead or management costs. <br /> Partial payments will be made for the lump sum contract price for"Mobilization" as follows: <br /> (a) When 5% of the total original contract amount is earned from other bid items, <br /> 50% of the amount bid for mobilization, or 5% of the total original contract <br /> amount, whichever is the least, will be paid. <br /> (b) When 10% of the total original contract amount is earned from other bid items. <br /> 100% of the amount bid for mobilization, or 10% of the total contract amount, <br /> whichever is the least, will be paid. <br /> Upon completion of all work on the project, payment of any amount bid for mobilization in <br /> excess of 10% of the total original contract amount will be paid. <br /> Bid Item 2 - Surveying <br /> Measurement and Payment: Lump Sum (LS) <br /> Measurement for surveying will be the ratio of actual pipe installed and backfilled to the <br /> total quantity of pipe listed in the Proposal. <br /> The lump sum bid for surveying includes, but is not limited to, all costs associated with <br /> furnishing all labor, tools, survey instruments materials, and other equipment necessary for <br /> the setting and monitoring the location, elevation, alignment and grade of the Work as <br /> specified in 1-05.4 CONFORMITY WITH AND DEVIATIONS FROM PLANS AND STAKES <br /> and the Plans. <br /> The lump sum bid item also includes, but is not limited to, all costs associated with <br /> furnishing all labor, tools, survey instruments, materials and other equipment necessary for <br /> verifying the rim and invert elevations, prior to construction, of all existing manholes and <br /> pipes where connections are to be made. <br /> The lump sum also includes, but is not limited to, all costs associated with furnishing all <br /> labor, tools, survey instruments, materials and other equipment necessary for obtaining the <br /> "as constructed" location and elevations of the Work, in particular, sewer pipe invert <br /> elevations and other information necessary for production of the Record Drawing (As- <br /> Water Main Replacement"W" Division B—BID DESCRIPTIONS April,2022 <br /> WO No.—UP3766 SP-3 <br /> I <br />