My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Constructed) documents meeting the requirements defined in RECORD DRAWINGS of <br /> these Special Provisions. <br /> Bid Item 3 - Force Account <br /> Measurement and Payment: Force Account (FA) <br /> This Force Account bid item shall be accomplished in accordance with 1-09.6 FORCE <br /> ACCOUNT; except, as modified below. <br /> The Force Account bid item has been included for specific miscellaneous work items listed <br /> below and for any additional work directed by the Engineer that is not required by the <br /> original Contract and to address changed conditions or unanticipated work. The amount <br /> indicated in the Proposal for this bid item is to provide a common bid amount. The actual <br /> amount paid under this bid item may vary from no payment to the full amount of the bid <br /> item. Work performed under this bid item will be initiated with a work directive issued by <br /> the Engineer. <br /> In lieu of the preceding prescribed method of determining payment for Force Account work, <br /> payment may be made at unit prices or lump sum prices agreed to by the Engineer and the <br /> Contractor prior to beginning the Force Account work. <br /> The following miscellaneous construction work will be paid for by Force Account as <br /> specified in 1-09.6 FORCE ACCOUNT. For the purpose of providing a common Proposal <br /> for all Bidders, and for that purpose only, the City has estimated an amount and included it <br /> in the bid item for Force Account work to become part of the total Bid by the Contractor. <br /> (a) Cost for additional excavation, fittings, and labor to make grade adjustments to I <br /> the new watermain for unknown underground conflicts and conflicts due to <br /> being unmarked or mismarked utilities in the field. <br /> (b) Restoration of existing special private improvements including, but not limited <br /> to, brick or stone walkways, decorative concrete walks or driveways, concrete <br /> masonry or stone walls, rockery's, fences, landscape plantings, including but <br /> not limited to, hedges, trees, flowerbeds, irrigation systems, yard lighting, <br /> rockeries, retaining walls, or steps. <br /> Bid Item 4 - Traffic Control Labor <br /> Measurement and Payment: Unit Price per Hour(HR) I <br /> This unit price bid item includes all costs associated with traffic control labor as identified in <br /> 1-10.3 FLAGGING, SIGNS, AND ALL OTHER TRAFFIC CONTROL DIVICES of these <br /> Special Provisions. <br /> Furnish all personnel for flagging to control traffic, including pedestrians, during <br /> construction operations in accordance with Section 1-10 of the Standard Specifications (as <br /> amended by the Special Provisions), the Plans, approved traffic control plans, these <br /> Special Provisions and as directed by the City. <br /> Bid Item 5 - Maintenance and Protection of Traffic Control <br /> Measurement and Payment: Lump Sum (LS) I <br /> Measurement for Maintenance and Protection of Traffic Control shall be the ratio of the <br /> number of working days completed to the total number of working days authorized in the <br /> Contract. <br /> This lump sum bid item includes the maintenance and protection of traffic control materials, <br /> tools, and equipment necessary to accomplish the Work in accordance with 1-10.3(2) <br /> TRAFFIC CONTROL PROCEDURES, including yet not limited to, signs, barricades, cones, I <br /> flashers, reader boards, and temporary pavement markings. Also included is cost <br /> Water Main Replacement"W" Division B—BID DESCRIPTIONS April, 2022 <br /> WO No.—UP3766 SP-4 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.