My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> The Work shall consist of one or more courses of asphalt treated base placed on the <br /> Subgrade in accordance with these Specifications and in conformity with the lines, grades, <br /> thicknesses, and typical cross-sections shown in the Plans or as staked. <br /> Do NOT construct the asphalt treated base course until all underground utilities are <br /> completed and inspected and approved by the Engineer. <br /> Asphalt treated base may be placed for providing temporary access to adjoining properties <br /> where directed by the Engineer. <br /> 4-06.2 Materials i <br /> Materials shall meet the requirements of the following sections: <br /> Asphalt 9-02.1 <br /> Anti-Stripping Additive 9-02.4 <br /> Aggregates 9-03.8 <br /> The grade of paving asphalt shall be as required in the Contract. <br /> 4-06.3 Construction Requirements I <br /> 4-06.3(1) Asphalt Mixing Plant <br /> Asphalt mixing plants for asphalt treated base shall meet the following requirements: <br /> Heating <br /> The plant shall be capable of heating the aggregates to the required temperature. <br /> Proportioning I <br /> The mixing plant shall be capable of proportioning: the aggregates to meet the <br /> Specifications; and the asphalt at the rate specified by the Engineer. If the aggregates <br /> are supplied in two or more sizes, means shall be provided for proportioning or blending <br /> the different sizes of aggregates to produce material meeting the Specification <br /> requirements. <br /> Recycled asphalt pavement (RAP) may be used in the production of ATB. If utilized, the <br /> amount of RAP shall not exceed 30 percent of the total weight of the ATB. The final <br /> gradation and asphalt binder content will conform to the approved Job Mix Formula <br /> (JMF). ATB will be evaluated under Commercial Evaluation as shown in section 9- <br /> 111 <br /> 03.8(7). Va limts under 9-03.8(7) are excluded from ATB evaluation criteria. <br /> Mixing <br /> The mixer shall be capable of producing a uniform mixture of uniformly coated I aggregates meeting the requirements of these Specifications. <br /> 4-06.3(2) Preparation of Aggregates <br /> Aggregates for asphalt treated base shall be stockpiled before use in accordance with <br /> the requirements of Section 3-02. <br /> The aggregates shall be heated as required by the Engineer. <br /> 4-06.3(2)A Mix Design <br /> The mix design requirements for asphalt treated base shall be as described in <br /> Section 5-04.3(7)A. <br /> 4-06.3(3) Vacant <br /> 4-06.3(4) Mixing <br /> The asphalt treated base shall be mixed in accordance with the requirements of Section 1 5-04.3(8). <br /> Water Main Replacement"W" Division 4—BASES April, 2022 , <br /> WO No—UP3766 SP—144 <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.