Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> necessary to satisfactorilycomplete the Work as specified in Section 2-02.3 3 of p p ( ) the <br /> Standard Specifications, these Special Provisions and as shown on the Plans. The unit <br /> price per lineal foot for the final saw-cutting of asphalt concrete pavement, up to 6-inch <br /> thickness includes, but is not limited to, the saw-cutting necessary for the final joint <br /> between existing pavement and permanent HMA pavement. <br /> Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid 1 <br /> item as there will be no separate payment for cleanup. <br /> Bid Item 10 - Saw-Cutting Concrete Pavement, Final Joint Cut, Up To 8-Inch <br /> Thickness I <br /> Measurement and Payment: Unit Price per Linear Foot (LF) <br /> Measurement for saw-cutting will be per linear foot along the true length of the surface cut. <br /> The unit price per lineal foot for the final saw-cutting of concrete pavement, up to 8-inch <br /> thickness, including asphalt over the concrete, and shall be full compensation for all labor, <br /> material, tools, and equipment necessary to satisfactorily complete the Work as specified in <br /> Section 2-02.3(3) of the Standard Specifications, these Special Provisions and as shown <br /> on the Plans. The unit price per lineal foot for the final saw-cutting of concrete pavement, <br /> up to 8-inch thickness includes, but is not limited to, the saw-cutting necessary for the final <br /> joint between existing concrete pavement and permanent concrete pavement repair. I <br /> Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid <br /> item as there will be no separate payment for cleanup. <br /> Bid Item 11 - Saw-Cutting Concrete Curb & Gutter&Sidewalk <br /> Measurement and Payment: Unit Price per Linear Foot (LF) <br /> Measurement for saw-cutting will be per linear foot along the true length of the surface cut. <br /> The unit price per lineal foot for the final saw-cutting of concrete curb and gutter and <br /> sidewalk, shall be full compensation for all labor, material, tools, and equipment necessary <br /> to satisfactorily complete the Work as specified in Section 2-02.3(3) of the Standard <br /> Specifications, these Special Provisions and as shown on the Plans. The unit price per <br /> lineal foot for the final saw-cutting of concrete curb and gutter and sidewalk includes, but is <br /> not limited to, the saw-cutting necessary for the final joint between existing concrete <br /> sidewalk or curb and permanent concrete repair. <br /> Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid <br /> item as there will be no separate payment for cleanup. <br /> Bid Item 12 - Foundation Material, Class A or B I <br /> Measurement and Payment: Unit Price per Ton (TON) <br /> Measurement for Foundation Material, Class A or B shall be by the ton, recorded on 111 <br /> certified weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT, and placed <br /> within the limits of dimensions defined in the Work, descriptions for other bid items, shown <br /> on the Plans, or COE Standard Drawings, or as otherwise approved by the Engineer. <br /> The unit price bid per ton shall constitute full compensation for all labor, tools, materials and <br /> equipment required to furnish, place, and compact foundation material as specified in the <br /> Standard Specifications, these Special Provisions and as shown on COE Standard <br /> Drawing No. 614. <br /> The unit price for this bid item includes all costs for dewatering and over-excavation, <br /> removal, haul, and disposal of unsuitable subgrade material below the pipe zone or <br /> roadway subgrade. <br /> Bid Item 13 - Gravel Borrow <br /> Water Main Replacement"W" Division B—BID DESCRIPTIONS April,2022 <br /> WO No.—UP3766 SP-6 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.