Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Measurement and Payment: Unit Price per Ton (TON) <br /> ' Measurement for Gravel Borrow shall be by the ton, recorded on certified weight tickets in <br /> accordance with 1-09.2 WEIGHING EQUIPMENT, and placed within the limits of <br /> dimensions defined in the Work, descriptions for other bid items, shown on the Plans, or <br /> COE Standard Drawings, or as otherwise approved by the Engineer. <br /> Measurement for gravel borrow shall be limited to maximum trench widths defined in the <br /> work descriptions for other bid items. <br /> The unit price per ton, based on certified weight tickets, for gravel borrow shall be full <br /> compensation for all labor, material, tools and equipment necessary to furnish imported <br /> gravel borrow for trench backfill where Engineer has determined native soils are not <br /> suitable for backfill, and other Work as required, from a Contractor-supplied source in <br /> accordance with 2-03.3(14)J of the Standard Specifications and these Special Provisions. <br /> The unit price for gravel borrow shall include all costs of furnishing, hauling, stockpiling, <br /> placing, grading and compacting the material in place. <br /> The unit price for this bid item includes all costs for removing, loading and disposing of <br /> displaced unsuitable material, including haul. <br /> Bid Item 14- Ductile Iron Pipe for Watermain, 6-Inch Diam. <br /> Bid Item 15 - Ductile Iron Pipe for Hydrant Lead, 6-Inch Diam. <br /> Bid Item 16 - Ductile Iron Pipe for Watermain, 8-Inch Diam. <br /> Bid Item 17 - Ductile Iron Pipe for Watermain, 12-Inch Diam. <br /> Measurement and Payment: Unit Price per Linear Foot (LF) <br /> Per linear foot pipe measurement shall be based on the slope distance from point to point. <br /> The point of beginning or ending of measurement in any particular run of pipe shall be the <br /> vertical intersection of the centerline of the pipe measured with the centerline of the <br /> intersection pipe, or with the beginning or ending of any new linear length of valves or <br /> couplings contained within the measured length. At changes in pipe size connected by a <br /> reducer, the point of measurement shall be taken as the midpoint of the reducer. <br /> The unit contract price for Ductile Iron Pipe For Watermain, _-Inch Diam., shall constitute <br /> full compensation for all labor, materials, tools and equipment necessary to furnish and <br /> install the pipe, restrained joints (where shown on the Plans or as required by the Standard <br /> Specifications and Special Provisions), and all fittings, including tees, crosses, reducers, <br /> couplings, and sleeves required for complete installation along the run of each pipe size, as <br /> shown on the Plans and specified herein, and additionally, shall include, but not be limited <br /> to, the following: <br /> 1. Removal of structures or obstructions not specifically covered under other Bid Items. <br /> This shall include, but not be limited to, removal and disposal of the existing asphalt or <br /> concrete pavement, sidewalk, curb, thrust blocks, miscellaneous landscaping, and sod <br /> as indicated on the Plans. <br /> 2. All required potholing to verify locations of water service crossings and existing utilities. <br /> The costs for pot-holing and excavation required to determine exact depths and <br /> locations of other utilities shall be included with this Work with no direct compensation <br /> made. <br /> 3. Utility or light pole holding in conformance with the requirements of the applicable utility <br /> including, if necessary, arranging for the utility to hold poles and paying the associated <br /> I fees. <br /> 4. Trench excavation and dewatering, installation of pipe, furnishing, placing and <br /> compacting sand backfill for pipe bedding, furnishing, placing and compacting suitable <br /> Water Main Replacement"W" Division B-BID DESCRIPTIONS April, 2022 <br /> WO No.-UP3766 SP-7 <br /> 1 <br />