<br /> CITY OF EVERETT SPECIAL PROVISIONS
<br /> Measurement and Payment: Unit Price per Ton (TON)
<br /> ' Measurement for Gravel Borrow shall be by the ton, recorded on certified weight tickets in
<br /> accordance with 1-09.2 WEIGHING EQUIPMENT, and placed within the limits of
<br /> dimensions defined in the Work, descriptions for other bid items, shown on the Plans, or
<br /> COE Standard Drawings, or as otherwise approved by the Engineer.
<br /> Measurement for gravel borrow shall be limited to maximum trench widths defined in the
<br /> work descriptions for other bid items.
<br /> The unit price per ton, based on certified weight tickets, for gravel borrow shall be full
<br /> compensation for all labor, material, tools and equipment necessary to furnish imported
<br /> gravel borrow for trench backfill where Engineer has determined native soils are not
<br /> suitable for backfill, and other Work as required, from a Contractor-supplied source in
<br /> accordance with 2-03.3(14)J of the Standard Specifications and these Special Provisions.
<br /> The unit price for gravel borrow shall include all costs of furnishing, hauling, stockpiling,
<br /> placing, grading and compacting the material in place.
<br /> The unit price for this bid item includes all costs for removing, loading and disposing of
<br /> displaced unsuitable material, including haul.
<br /> Bid Item 14- Ductile Iron Pipe for Watermain, 6-Inch Diam.
<br /> Bid Item 15 - Ductile Iron Pipe for Hydrant Lead, 6-Inch Diam.
<br /> Bid Item 16 - Ductile Iron Pipe for Watermain, 8-Inch Diam.
<br /> Bid Item 17 - Ductile Iron Pipe for Watermain, 12-Inch Diam.
<br /> Measurement and Payment: Unit Price per Linear Foot (LF)
<br /> Per linear foot pipe measurement shall be based on the slope distance from point to point.
<br /> The point of beginning or ending of measurement in any particular run of pipe shall be the
<br /> vertical intersection of the centerline of the pipe measured with the centerline of the
<br /> intersection pipe, or with the beginning or ending of any new linear length of valves or
<br /> couplings contained within the measured length. At changes in pipe size connected by a
<br /> reducer, the point of measurement shall be taken as the midpoint of the reducer.
<br /> The unit contract price for Ductile Iron Pipe For Watermain, _-Inch Diam., shall constitute
<br /> full compensation for all labor, materials, tools and equipment necessary to furnish and
<br /> install the pipe, restrained joints (where shown on the Plans or as required by the Standard
<br /> Specifications and Special Provisions), and all fittings, including tees, crosses, reducers,
<br /> couplings, and sleeves required for complete installation along the run of each pipe size, as
<br /> shown on the Plans and specified herein, and additionally, shall include, but not be limited
<br /> to, the following:
<br /> 1. Removal of structures or obstructions not specifically covered under other Bid Items.
<br /> This shall include, but not be limited to, removal and disposal of the existing asphalt or
<br /> concrete pavement, sidewalk, curb, thrust blocks, miscellaneous landscaping, and sod
<br /> as indicated on the Plans.
<br /> 2. All required potholing to verify locations of water service crossings and existing utilities.
<br /> The costs for pot-holing and excavation required to determine exact depths and
<br /> locations of other utilities shall be included with this Work with no direct compensation
<br /> made.
<br /> 3. Utility or light pole holding in conformance with the requirements of the applicable utility
<br /> including, if necessary, arranging for the utility to hold poles and paying the associated
<br /> I fees.
<br /> 4. Trench excavation and dewatering, installation of pipe, furnishing, placing and
<br /> compacting sand backfill for pipe bedding, furnishing, placing and compacting suitable
<br /> Water Main Replacement"W" Division B-BID DESCRIPTIONS April, 2022
<br /> WO No.-UP3766 SP-7