My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> compacting foundation material as required; g and placingof controlled densityfill <br /> furnishing <br /> material, cleaning and flushing catch basins; reconnecting existing storm drainage <br /> connections; furnishing and installing gas traps; and replacing; protecting, and maintaining <br /> utilities. <br /> All costs associated with abandoning, and/or removing and disposing of existing catch <br /> basins and inlets, salvaging frame and grate or cover, as shown on the plans shall be <br /> included in the unit price for this bid item. <br /> Adjusting new catch basin inlets to final grade is incidental and shall be included in the unit <br /> price for this bid item. <br /> The cost of connection of pipes to the inlet or catch basin is incidental and shall be included <br /> in the unit price for this bid item. <br /> Measurement and payment shall be per each catch basin inlet installed as measured upon <br /> completion. <br /> Bid Item 32 - Topsoil, Type A and Seeding <br /> Measurement and Payment: Unit Price per Square Yard (SY) <br /> Measurement for providing 4-inch thick Topsoil, Type A shall be limited to dimensions and <br /> work limits defined in the work descriptions for other bid items, shown on the Plans, details <br /> or COE Standard Drawings or as otherwise approved by the Engineer. <br /> The unit price per square yard for Topsoil, Type A & Seeding shall be full compensation for <br /> all labor, compaction, material, tools, and equipment necessary to provide compacted 4 <br /> inches thick imported Topsoil, Type A for the Work as required, from a Contractor-supplied <br /> source in accordance with the Standard Specifications and these Special Provisions. <br /> The unit price for Topsoil, Type A & Seeding includes all costs for hauling, stockpiling, <br /> placing, grading, compacting, seeding, and controlling moisture content. <br /> Also to be included in this bid item shall be the cost of all subgrade preparation and grader <br /> work, or any other equipment required to establish correct surfaces to proper grade before <br /> the topsoil is placed, as well as all equipment required to spread and compact the topsoil <br /> uniformly on the surface to be seeded. Also included shall be the costs for removing, <br /> loading, hauling, and disposing of unsuitable or displaced materials. <br /> Include cost of sprinkling during dry periods prior to placement of the topsoil and while <br /> spreading and compacting the material along with turf establishment in the unit price for <br /> this bid item. <br /> Payment for Topsoil, Type A& Seeding will be determined by the square yard as measured <br /> in place. <br /> Bid Item 33 - Monument Cases <br /> Measurement and Payment: Unit Price per Each (EA) <br /> The unit price per each for monument case shall be full compensation for furnishing and <br /> placing the survey monument and monument case and cover, in accordance with the COE <br /> Standard Drawing 323, 324 and 325, Standard Specifications and these Special <br /> Provisions, in conformity with the lines and locations shown on the Plans. <br /> Bid Item 34 - Temporary Roadway Patch <br /> Measurement and Payment: Unit Price per Lump Sum (LS) <br /> No measurement will be made for the lump sum item Temporary Roadway Patch. <br /> Payment for the lump sum item Temporary Roadway Patch shall be a one-time lump sum <br /> regardless of how many times Temporary Roadway Patch is placed, removed, replaced, or <br /> Water Main Replacement"W" Division B-BID DESCRIPTIONS April,2022 <br /> WO No.-UP3766 SP-11 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.