Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> ITable of Contents <br /> ITable of Contents i <br /> ADVERTISEMENT FOR BIDS 1 <br /> I DIVISION B - BID ITEM DESCRIPTIONS 3 <br /> DIVISION P - PROPOSAL 15 <br /> BID SCHEDULE 17 <br /> IPROPOSAL SIGNATURE SHEET 20 <br /> SUBCONTRACTORS FORM 21 <br /> DISADVANTAGED/WOMEN'S BUSINESS ENTERPRISE 22 <br /> INON-COLLUSION AFFIDAVIT 23 <br /> BID DEPOSIT 24 <br /> I BID BOND 24 <br /> DIVISION C - CONTRACT 27 <br /> PAYMENT BOND 31 <br /> IPERFORMANCE BOND 33 <br /> DIVISION 1 — GENERAL REQUIREMENTS 35 <br /> General Description and Location of Project (******) 35 <br /> IDesign Engineer (******) 35 <br /> Standard Specifications (******) 35 <br /> Il-Ui DEFINITIONS AND TERMS 36 <br /> 1-01.3 Definitions 36 <br /> 1-02 BID PROCEDURES AND CONDITIONS 42 <br /> I 1-02.1 Prequalifications of Bidders 42 <br /> 1-02.1 Bidder Responsibility Criteria (******) 42 <br /> 1-02.2 Plans and Specifications 43 <br /> I 1-02.4 Examination of Plans, Specifications, and Site of Work 43 <br /> 1-02.5 Proposal Form 45 <br /> 1-02.6 Preparation of Proposal 45 <br /> I 1-02.7 Bid Deposit 46 <br /> 1-02.8 Noncollusion Declaration and Lobbying Certification 46 <br /> 1-02.9 Delivery of Proposal 46 <br /> I1-02.10 Withdrawing, Revising, or Supplementing Proposal 47 <br /> 1-02.12 Public Opening of Proposals 47 <br /> 1-02.13 Irregular Proposals 47 <br /> I1-02.14 Disqualification of Bidders 48 <br /> 1-02.15 Pre-Award Information 48 <br /> 1-03 AWARD AND EXECUTION OF CONTRACT 49 <br /> I1-03.1 Consideration of Bids 49 <br /> Water Main Replacement"W" Table of Contents- April 2022 <br /> IWO No.—UP3766 SP-i <br /> I . <br />