My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-03.2 Award of Contract 49 <br /> 1-03.3 Execution of Contract 50 I <br /> 1-03.4 Contract Bond 50 <br /> 1-03.5 Failure to Execute Contract 50 <br /> 1-03.6 Return of Bid Deposit 51 <br /> 1-03.7 Judicial Review 51 <br /> 1-04 SCOPE OF THE WORK 51 <br /> 1-04.1 Intent of the Contract 51 <br /> 1-04.2 Coordination of Contract Documents, Plans, Special Provisions Specifications, and Addenda 52 <br /> 1-04.3 Reference Information 53 <br /> 1-04.4 Changes 53 I <br /> 1-04.4 Changes 53 <br /> 1-04.5 Procedure and Protest by the Contractor 54 <br /> 1-04.5 Notice by Contractor (******) 55 <br /> 1-04.6 Variation in Estimated Quantities 56 <br /> 1-04.7 Differing Site Conditions (Changed Conditions) 56 <br /> 1-05 CONTROL OF WORK 57 <br /> 1-05.1 Authority of the Engineer 57 <br /> 1-05.1 City(******) 57 <br /> 1-05.2 Authority of Assistants and Inspectors 57 <br /> 1-05.2 City's Representative (******) 57 <br /> 1-05.3 Working Drawings 59 <br /> 1-05.4 Conformity With and Deviations From Plans and Stakes 61 , <br /> 1-05.6 Inspection of Work and Materials 62 <br /> 1-05.7 Removal of Defective and Unauthorized Work 63 <br /> 1-05.10 Guarantees 64 <br /> 1-05.11 Final Inspection 65 <br /> 1-05.11 Final Inspections and Operational Testing (******) 65 I <br /> 1-05.12 Final Acceptance 66 <br /> 1-05.13 Superintendents, Labor and Equipment of Contractor 67 <br /> 1-05.14 Cooperation With Other Contractors 67 <br /> 1-05.16 Water and Power (******) 68 <br /> 1-05.17 Oral Agreements (******) 68 <br /> 1-05.18 Contractor (******) 68 <br /> 1-05.19 City-Contractor Coordination (******) 70 <br /> 1-06 CONTROL OF MATERIAL 72 <br /> 1-06.1 Approval of Materials Prior to Use 72 <br /> 1-06.2 Acceptance of Materials 72 <br /> 1-06.3 Manufacturer's Certificate of Compliance 73 <br /> 1-06.4 Handling and Storing Materials 73 I <br /> 1-06.6 Recycled Materials 73 <br /> 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC 74 <br /> 1-07.1 Laws to be Observed 74 1 <br /> 1-07.2 State Taxes 74 <br /> Water Main Replacement"W" Table of Contents - April 2022 <br /> WO No.-UP3766 SP -ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.