My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ' CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION 1 — GENERAL REQUIREMENTS <br /> Supplement Division 1 by adding the following: <br /> General Description and Location of Project <br /> ' (******) <br /> Work being performed includes furnishing all labor, materials and equipment necessary to <br /> construct approximately 3,971 linear feet of water main and other such appurtenances and <br /> performing all Work as required by the Contract, in accordance with the Contract Plans and <br /> Contract Provisions. <br /> The Project is in Everett, Washington, and is generally located on Wilmington Avenue <br /> between Evergreen Way and 52nd Street, and Hoyt Avenue between 41' Street and 44th <br /> Street. <br /> Design Engineer <br /> Questions and inquiries about these Contract Documents should be directed in writing to the <br /> attention of Arnie Roshak, City Project Manager, aroshak@everettwa.gov. <br /> Standard Specifications <br /> (******) <br /> ' All Work under this Contract shall be performed in accordance with the following <br /> Specifications except as may be exempted or modified by other sections of these Contract <br /> Documents. These Specifications are incorporated by reference, made a part of this Contract <br /> and shall control and guide all activities within this Project whether referred to directly, <br /> ' paragraph by paragraph. <br /> WSDOT/APWA "2021 Standard Specifications for Road, Bridge and Municipal <br /> Construction", as amended, hereinafter referred to as the "Standard Specifications." <br /> The Standard Specifications, as modified or supplemented by these Special Provisions, all <br /> of which are made a part of the Contract Documents, shall govern all of the Work. The <br /> following latest edition of other specifications and standard plans shall apply to the extent to <br /> which they are called out in the Contract Documents: <br /> 1. City of Everett"Design and Construction Standards and Specifications", latest <br /> edition as found on the Web at"http://everettwa.gov/DocumentCenterNiew/243". <br /> 2. "Standard Plans for Road and Bridge Construction", as prepared by WSDOT. <br /> 3. "Manual on Uniform Traffic Control Devices (MUTCD)." <br /> 4. APWA Standards. <br /> ' 5. AWWA Standards. <br /> Each Provision of these Special Provisions either supplements, modifies, or replaces the <br /> comparable Standard Specification, or is a new Provision. The deletion, amendment, <br /> ' alteration, or addition to any subsection or portion of the Standard Specifications is meant to <br /> pertain only to that particular portion of the section, and in no way should it be interpreted <br /> that the balance of the section does not apply. <br /> ' Sections and subsections in the Special Provisions labeled under the headers with (******) <br /> indicate City of Everett Provisions. <br /> 1 <br /> ' Water Main Replacement"W" Division 1 —GENERAL REQUIREMENTS April,2022 <br /> WO No.—UP3766 SP—37 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.