My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS ' <br /> 1-01 DEFINITIONS AND TERMS <br /> 1-01.3 Definitions ' <br /> Delete the three paragraphs under the heading Completion Dates, and substitute the <br /> following: <br /> Substantial Completion Date: The day the Engineer determines the City has full and <br /> unrestricted use and benefit of the facilities, both from the operational and safety <br /> standpoint, any remaining traffic disruptions will be rare and brief, and only minor <br /> incidental work, replacement of temporary substitute facilities, plant establishment <br /> periods, or correction or repair remains for the Physical Completion of the total Contract. <br /> Physical Completion Date: The day all of the Work is physically completed on the <br /> project. All documentation required by the Contract and required by law does not <br /> necessarily need to be furnished by the Contractor by this date. <br /> Completion Date: Date on which Project is ready for Final Acceptance. All physical <br /> work, including Punch List, is complete and Contractor has completed and fulfilled all <br /> contractual obligations except any maintenance of landscaping. Contractual obligations <br /> that must be fulfilled prior to achievement of the Completion Date include, and are not <br /> limited to; the Contractor's furnishing all documentation, including correct, complete and <br /> accurate as-built or record drawings and operation and maintenance manuals and <br /> transfer of warranties. <br /> (This definition replaces the definition in WSDOT 1-01.3 for Completion Dates.) <br /> Revise the following definitions to read as follows: <br /> Award: The decision by Everett City Council to award a contract and authorize the <br /> Mayor to sign the Contract. No contract is formed until the Mayor signs the contract. <br /> (This definition replaces the definition in WSDOT 1-01.3 for Bid Documents.) <br /> Bid Documents: The component parts of the proposed Contract which may include, <br /> but are not limited to, the Proposal Form, the proposed Contract Provisions, the ' <br /> proposed Contract Plans, and Addenda. (This definition replaces the definition in <br /> WSDOT 1-01.3 for Bid Documents.) <br /> Contract: Written agreement signed between the City and Contractor and includes <br /> Division C — CONTRACT, Division P - PROPOSAL, Division B — BID ITEM <br /> DESCRIPTIONS, Special Provisions, Contract Plans, Standard Specifications and <br /> amendments, Standard Plans in effect as of the date Bids are opened, Addenda, <br /> supplemental agreements, change orders, certifications and affidavits required by this <br /> Contract and by law, and Federal requirements that apply to this Contract and Project. <br /> (This definition replaces the definition in WSDOT 1-01.3 for Contract.) <br /> Contract Bond(s): Include a separate performance bond and payment bond, as set <br /> forth in the Contract Documents. (This definition supplements the definition in WSDOT <br /> 1-01.3 for Contract Bond.) <br /> Engineer: The City's representative who administers the construction program for the <br /> City. Provisions in the Contract Documents that state the Engineer"shall" or"will" shall <br /> be deemed to mean that the Engineer shall or will take such action if requested in writing <br /> by the Contractor. (This definition replaces the definition in WSDOT 1-01.3 for <br /> Engineer.) <br /> Specifications: Includes 2021 WSDOT/APWA Standard Specifications and latest <br /> Amendments, and all other specifications (including these Special Provisions) for the <br /> prescribed Work in this Contract. (This definition replaces the definition in WSDOT 1- <br /> 01.3 for Specifications.) <br /> Water Main Replacement"W" Division 1 —GENERAL REQUIREMENTS April,2022 <br /> WO No.—UP3766 SP—38 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.