Laserfiche WebLink
' CITY OF EVERETT SPECIAL PROVISIONS <br /> Working Drawings: Drawings, shop drawings, plans, diagrams, or calculations, <br /> ' including a schedule of submittal dates for Working Drawings where specified, which the <br /> Contractor must submit to the Engineer. (This definition replaces the definition in <br /> WSDOT 1-01.3 for Working Drawings.) <br /> ' Supplement Section 1-01.3 by adding the following: <br /> All references in the Standard Specifications to the terms "State", "Department of <br /> Transportation", "Washington State Transportation Commission", "Commission", <br /> ' "Secretary of Transportation", "Secretary", "Headquarters", and "State Treasurer" shall <br /> be revised to read "City." <br /> All references to the terms "State" or "state" shall be revised to read "City" unless the <br /> reference is to an administrative agency of the State of Washington, a State statute or <br /> regulation, or the context reasonably indicates otherwise. <br /> All references to "State Materials Laboratory" shall be revised to read "City designated <br /> location." <br /> ' All references to "final contract voucher certification" shall be interpreted to mean the <br /> City form(s) by which final payment is authorized, and final completion and acceptance <br /> granted. <br /> Additive: A supplemental unit of work or group of bid items, identified separately in the <br /> p Y <br /> Proposal, that may, at the discretion of the City, be awarded in addition to the base Bid. <br /> Alternative or Alternate: One of two or more units of Work or groups of bid items, <br /> identified separately in the Proposal, from which the City may make a choice between <br /> different methods or material of construction for performing the same Work. <br /> Award Date: The date of the formal action by the Everett City Council to accept the <br /> lowest responsible and responsive Bidder for the Work. <br /> Baseline COVID-19 Requirements: Baseline COVID-19 Requirements include all <br /> ' COVID-19 Requirements applicable to the Work as of the date of Bid opening. <br /> Bid Opening Date: The date the Everett City Clerk publicly opens and reads the Bids. <br /> Business Day: A business day is any day from Monday through Friday except holidays <br /> as listed in 1-08.5. <br /> Change Order: Reference to Change Order shall include all rights of the City and <br /> Contractor under 1-04.4 CHANGES. Agreed Change Orders shall be in the form <br /> 1 attached as Appendix C. Unilateral Change Orders shall be in the form attached as <br /> Appendix C. <br /> City: The City of Everett, Washington. "City" and "Owner" and "Contracting Agency" <br /> mean the same. <br /> City's Representative: The person designated in writing by the City to act as its <br /> representative at the construction site and to perform construction inspection service <br /> ' and administrative functions relating to this Contract. The terms "Engineer", "Architect", <br /> or"Owner's Representative" shall be interchangeable with City's Representative. <br /> Contract Claim: Any request by the Contractor for additional time or money resulting <br /> ' in adjustment of Contract Sum or Contract Time irrespective of the cause or reason for <br /> the request. Contract Claims include, but are not limited to, requests by the Contractor <br /> for additional time or money due to Extra Work, inefficiencies, Delays, interferences, and <br /> problems with the design. Contract Claim includes, but is not limited to, claims or <br /> ' requests by Subcontractors for extensions of Contract Time, adjustment of Contract <br /> Sum, additional compensation that the Contractor attempts to pass through or assert <br /> Water Main Replacement"W" Division 1 —GENERAL REQUIREMENTS April,2022 <br /> WO No.—UP3766 SP—39 <br />