My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> f. The Proposal form is not properly executed; <br /> g. The Bidder fails to submit or properly complete, on the form provided by the I <br /> City, the Subcontractor list, if applicable, as required in 1-02.6; <br /> h. The Bidder fails to submit or properly complete, on the form provided by the <br /> City, the Disadvantaged/Minority/Women's Business Enterprise Certification, <br /> as required in 1-02.6; <br /> i. The Bid Proposal does not constitute a definite and unqualified offer to meet <br /> the material terms of the Bid invitation; <br /> j. More than one proposal is submitted for the same project from a Bidder under <br /> the same or different names; or <br /> k. The Bidder fails to submit or properly complete, on the form provided by the <br /> City, the Non-Collusion Affidavit, as required in 1-02.8(1). <br /> 2. A Proposal may be considered irregular and may be rejected if: <br /> a. The Proposal does not include a unit price for every Bid item; I <br /> b. Any of the unit prices are excessively unbalanced (either above or below the <br /> amount of a reasonable Bid) to the potential detriment of the City, as <br /> determined by the City; <br /> c. Receipt of Addenda is not acknowledged; <br /> d. A member of a joint venture or partnership and the joint venture or partnership <br /> submit Proposals for the same project (in such an instance, both Bids may be <br /> rejected); or <br /> e. If Proposal form entries are not made in ink. <br /> 1-02.14 Disqualification of Bidders I <br /> Revise 1-02.14 to read as follows: <br /> A Bidder will be deemed not responsible if the Bidder does not meet the mandatory <br /> bidder responsibility criteria in RCW 39.04.350(1), as amended, and noted in 1-02.1(1). <br /> The City will verify that the Bidder meets the mandatory bidder responsibility criteria in <br /> RCW 39.04.350(1). To assess bidder responsibility, the City reserves the right to request <br /> documentation as needed from the Bidder and third parties concerning the Bidder's <br /> 111 <br /> compliance with the mandatory bidder responsibility criteria. <br /> If the City determines the Bidder does not meet the mandatory bidder responsibility <br /> criteria in RCW 39.04.350(1) and is therefore not a responsible Bidder, the City shall <br /> notify the Bidder in writing,with the reasons for its determination. If the Bidder disagrees <br /> with this determination, it may appeal the determination within two business days of the <br /> City's determination by presenting its appeal and any additional information to the City. <br /> The City will consider the appeal and any additional information before issuing its final <br /> determination. If the final determination affirms that the Bidder is not responsible, the <br /> City will not execute a contract with any other Bidder until at least two business days <br /> after the Bidder determined to be not responsible has received the City's final <br /> determination. <br /> If the Contract Documents contain supplemental responsibility criteria, then a Bidder will <br /> be deemed not responsible if the Bidder does not meet those criteria: 1 <br /> 1-02.15 Pre-Award Information <br /> Revise 1-02.15 to read as follows: <br /> Before awarding any contract, the City may require one or more of these items or actions <br /> of the apparent lowest responsible Bidder: <br /> Water Main Replacement"W" Division 1 —GENERAL REQUIREMENTS April,2022— <br /> WO No. UP3766 SP 48 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.