Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-04.1(3)C(2) Conflicting Provisions <br /> In the event an item of Work is described differently in two or more locations on , <br /> the Plans, in the Specifications and Special Provisions, the Contractor shall, <br /> upon request of the City's Representative, submit in writing to the City's <br /> Representative the description upon which the Contractor relied in preparing <br /> its Bid or laying out the Work. <br /> 1-04.1(3)D Utilities <br /> 1-04.1(3)D(1) General <br /> The City has endeavored to determine the existence of public and private <br /> utilities at the site of the Work from the records of the owners of known utilities <br /> in the vicinity of the Work. The positions of these utilities as derived from such <br /> records are shown on the Plans. Unless otherwise noted, no excavations were <br /> made to verify the locations shown for underground utilities. The service <br /> connections to the gas, electric, cable TV and communication utilities are not <br /> shown on the Plans. Refer to 1-07.17 UTILITIES AND SIMILAR FACILITIES <br /> regarding Contractor's responsibility for locating and verifying underground <br /> public and private utilities. <br /> 1-04.1(3)D(2) Unknown/Incorrectly Marked Utilities 1 <br /> When a utility interferes with the Work and is either (1) not identified on the <br /> Plans or (2) located in a position significantly different from that specified on <br /> the Plans or in accordance with a particular utility's standard depth and location, <br /> Contractor shall follow the procedures of 1-04.7 DIFFERING SITE <br /> CONDITIONS (CHANGED CONDITIONS). Interference with the Work is <br /> defined as a utility that crosses or projects into the plane of the Work at an <br /> elevation between the top and bottom of the Work. <br /> 1-04.2 Coordination of Contract Documents, Plans, Special Provisions <br /> Specifications, and Addenda <br /> Revise the first and second paragraphs of 1-04.2 to read as follows: <br /> The complete Contract includes Division C — CONTRACT, Division P - PROPOSAL, l� <br /> Division B — BID ITEM DESCRIPTIONS, Special Provisions, Contract Plans, Standard <br /> Specifications, Standard Plans in effect as of the date Bids are opened, Addenda, <br /> supplemental agreements, change orders, certifications and affidavits required by this <br /> Contract and by law, and Federal requirements that apply to this Contract and Project. <br /> These parts complement each other in describing a complete Work.Any requirement in <br /> one part binds as if stated in all parts.The Contractor shall provide any Work or materials <br /> clearly implied in the Contract even if the Contract does not mention it specifically. <br /> Any inconsistency in the parts of the Contract shall be resolved by following this order <br /> of precedence: <br /> 1. Change Orders, <br /> 2. Addenda, <br /> 3. Division C— CONTRACT, <br /> 4. Division P - PROPOSAL, <br /> 5. Division B — BID ITEM DESCRIPTIONS <br /> 6. Special Provisions, <br /> 7. Contract Plans, <br /> Water Main Replacement"W" Division 1 —GENERAL REQUIREMENTS April,2022 1 <br /> WO No.—UP3766 SP—52 <br /> I <br />