My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 8. City's Standard Drawings (if any) <br /> 9. WSDOT/APWA Standard Specifications for Road, Bridge, and Municipal <br /> Construction, <br /> 10.WSDOT/APWA Standard Plans for Road, Bridge and Municipal Construction. <br /> Revise the seventh paragraph of 1.04.2 to read as follows: <br /> In case of any ambiguity or dispute over interpreting the Contract, the Engineer's <br /> decision will be final as provided in 1-05.1 AUTHORITY OF THE ENGINEER. <br /> 1-04.3 Reference Information <br /> Revise 1-04.3 to read as follows: <br /> Reference Information provided to the Contractor is not part of the Contract. The City of <br /> Everett does not guarantee the accuracy of the Reference Information and is not <br /> responsible for the content of the Reference Information in any manner. Any use of <br /> Reference Information by the Contractor is done solely at the Contractor's risk. <br /> 1-04.4 Changes <br /> Delete 1-04.4 and substitute the following: <br /> 1-04.4 Changes <br /> 1-04.4(1) City's Right to Direct Changes to the Work <br /> (******) <br /> The City reserves the right to change the Work at any time. Such changes shall not <br /> invalidate the Contract nor release the Surety, and the Contractor agrees to perform the <br /> Work as changed. Among others, these changes and alterations may include: <br /> 1. Deleting or omitting any part of the Work, Equipment or material to be <br /> provided under this Contract, <br /> 2. Increasing or decreasing quantities, <br /> 3. Altering Specifications, designs, or both, <br /> 4. Altering the way the Work is to be done, <br /> 5. Adding new Work or Extra Work, <br /> 6. Altering facilities, Equipment, materials, services, or sites, provided by the <br /> City, and <br /> 7. Ordering the Contractor to accelerate or Delay the Work. <br /> If the Contractor and City do not agree upon scope of Work changed or adjustment to <br /> the Contract Sum and Contract Time, the City may, at its sole option, unilaterally direct <br /> the Contractor to implement City directed change by notice. The City shall not pay or <br /> be responsible or liable for changes implemented by the Contractor without explicit <br /> notice from the City to proceed. <br /> 1-04.4(2) Extra Work <br /> (******) <br /> At its sole option, the City may (1) perform Extra Work itself, (2) employ others to do it, <br /> (3) direct the Contractor to perform the Extra Work at existing unit Bid price, (4) direct <br /> the Contractor to perform the Extra Work at a mutually agreed upon price, or (5) direct <br /> the Contractor to perform the Extra Work on a Force Account basis. <br /> 1-04.4(3) Change Orders <br /> (******) <br /> Changes to the Work may result in an increase or decrease in Contract Sum,as provided <br /> in 1-09.4 Equitable Adjustment. Requests for an increase in Contract Time shall be made <br /> as provided in 1-08.3 PROGRESS SCHEDULE as applicable. Substantial changes in <br /> Water Main Replacement"W" Division 1 -GENERAL REQUIREMENTS April, 2022 <br /> WO No.-UP3766 SP-53 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.