My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> and the Engineer has given written approval of each such variation by a specific written <br /> notation thereof incorporated in or accompanying the returned Working Drawing; nor will <br /> review by Engineer relieve Contractor from responsibility for errors or omissions in the <br /> Working Drawings or from responsibility for having complied with the provisions of this <br /> section. <br /> The Bid prices shall include all costs for furnishing Working Drawings and Submittals. <br /> The following listed sections of the Standard Specifications and Special Provisions <br /> require Working Drawings that may or may not be applicable to this specific project. This <br /> list is supplied as an aid to the Contractor and is by no means complete. Submittal <br /> requirements may be found in 1-05.3(1) or elsewhere in these Special Provisions. <br /> DIVISION 2 EARTHWORK <br /> 2-09.3(3)D Shoring, Cribbing, and Cofferdams-Shop Drawings111 <br /> DIVISION 7 DRAINAGE STRUCTURES, STORM SEWERS, SANITARY <br /> SEWERS, WATER MAINS, AND CONDUITS <br /> 7-04 Storm Sewers <br /> 7-04.2 Materials-Catalog Cuts or Standard Plans <br /> 7-05 Manholes, Inlets, Catch Basins, and Drywells <br /> 7-05.2 Materials-Catalog Cuts or Standard Plans <br /> 7-09 Water Mains <br /> 7-09.2 Materials-Catalog Cuts or Standard Plans , <br /> 7-12 Valves For Water Mains <br /> 7-12.2 Materials-Catalog Cuts or Standard Plans <br /> 7-14 Hydrants <br /> 7-14.2 Materials-Catalog Cuts or Standard Plans <br /> 7-15 Service Connections <br /> 7-15.2 Materials-Catalog Cuts or Standard Plans <br /> DIVISION 8 MISCELLANEOUS CONSTRUCTION <br /> 8-13 Monument Cases <br /> 8-13.2 Materials-Standard Plans <br /> Deviations from Standard Plans will be subject to a Working Drawing submitted by the <br /> Contractor and approved by the Engineer. Where a Working Drawing is required by the <br /> Specifications, related Work performed prior to completion of the Engineer's review of <br /> the pertinent submission will be the sole expense and responsibility of the Contractor. <br /> Supplement 1-05.3 by adding the following: <br /> 1-05.3(1) Submittals <br /> (******) <br /> Where required by the Contract Documents, the Contractor shall submit information, <br /> such as Working Drawings that will enable the City's Representative to advise the City <br /> whether the Contractor's proposed materials, Equipment or methods of work are in <br /> general conformance to the design concept and in compliance with the Plans and <br /> Specifications. Approval or acceptance of a Submittal does not relieve Contractor from <br /> complying with Contract requirements. The City's approval of a Submittal does not <br /> constitute a waiver of the Contract requirements. The City will not be obligated to accept <br /> or pay for Work performed by the Contractor that may be affected by materials, <br /> Equipment, or methods of work not submitted in a timely manner so that final review can <br /> be accomplished before the affected Work is complete. The City shall not be responsible <br /> Water Main Replacement"W" Division 1 —GENERAL REQUIREMENTS April,2022 ' <br /> WO No.—UP3766 SP—60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.