My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> 7-04.1 Description 171 <br /> 7-04.2 Materials 171 <br /> 7-04.3 Construction Requirements 171 <br /> 7-04.4 Measurement 171 <br /> 7-04.5 Payment 171 <br /> 7-05 MANHOLES, INLETS, AND CATCH BASINS 172 <br /> 7-05.1 Description 172 <br /> 7-05.2 Materials 172 <br /> 7-05.3 Construction Requirements 172 <br /> 7-05.4 Measurement 173 <br /> 7-05.5 Payment 173 <br /> 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS 173 <br /> 7-08.1 Description 174 <br /> 7-08.2 Materials 174 <br /> 7-08.3 Construction Requirements 174 <br /> 7-08.4 Measurement 176 <br /> 7-08.5 Payment 176 <br /> 7-09 WATERMAINS 176 <br /> 7-09.1 Description 176 <br /> 7-09.2 Materials 176 <br /> 7-09.3 Construction Requirements 176 <br /> 7-09.4 Measurement 182 <br /> 7-09.5 Payment 182 <br /> 7-12 VALVES FOR WATERMAINS 182 <br /> 7-12.1 Description 182 <br /> 7-12.2 Materials 183 <br /> 7-12.3 Construction Requirements 183 <br /> 7-12.4 Measurement 184 <br /> 7-12.5 Payment 184 <br /> 111 <br /> 7-14 HYDRANTS 184 <br /> 7-14.1 Description 184 <br /> 7-14.2 Materials 184 <br /> 7-14.3 Construction Requirements 184 <br /> 7-14.4 Measurement 185 <br /> 7-14.5 Payment 185 <br /> 7-15 SERVICE CONNECTIONS 185 <br /> 7-15.1 Description 185 <br /> 7-15.2 Materials 185 <br /> 7-15.3 Construction Requirements 185 <br /> 7-15.4 Measurement 186 <br /> 7-15.5 Payment 186 <br /> DIVISION 8 - MISCELLANEOUS CONSTRUCTION 189 <br /> 8-01 EROSION CONTROL 189 <br /> Water Main Replacement"W" Table of Contents - April 2022 <br /> WO No.-UP3766 SP -vi <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.