My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> 2-04.5 Payment 138 <br /> I 2-07 WATERING 139 <br /> 2-07.3 Construction Requirements 139 <br /> 2-07.4 Measurement 139 <br /> I 2-07.5 Payment 139 <br /> 2-09 STRUCTURE EXCAVATION 139 <br /> 2-09.2 Materials 139 <br /> I 2-09.3 Construction Requirements 140 <br /> 2-09.4 Measurement 140 <br /> 2-09.5 Payment 141 <br /> I2-11 TRIMMING AND CLEANUP 141 <br /> 2-11.3 Construction Requirements 141 <br /> 2-11.4 Vacant 141 <br /> I2-11.4 Measurement 141 <br /> 2-11.5 Payment 141 <br /> DIVISION 4 - BASES 143 <br /> I4-04 BALLAST AND CRUSHED SURFACING 143 <br /> 4-04.1 Description 143 <br /> I 4-04.3 Construction Requirements 143 <br /> 4-04.4 Measurement 143 <br /> 4-04.5 Payment 143 <br /> I 4-06 ASPHALT TREATED BASE 143 <br /> 4-06.1 Description 143 <br /> 4-06.2 Materials 143 <br /> I 4-06.3 Construction Requirements 143 <br /> 4-06.4 Measurement 145 <br /> 4-06.5 Payment 145 <br /> I DIVISION 5 - SURFACE TREATMENTS AND PAVEMENTS 147 <br /> 5-04 HOT MIX ASPHALT 147 <br /> 5-04.1 Description 147 <br /> I 5-04.2 Materials 147 <br /> 5-04.3 Construction Requirements 149 <br /> 5-04.4 Measurement 168 <br /> I5-04.5 Payment 168 <br /> 5-06 PAVEMENT PATCHING (******) 168 <br /> 5-06.1 Description 168 <br /> I5-06.2 Materials 168 <br /> 5-06.3 Construction Requirements 168 <br /> 5-06.4 Measurement 170 <br /> 5-06.5 Payment 170 <br /> DIVISION 7 - DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS, <br /> I WATERMAINS, AND CONDUITS 171 <br /> 7-04 STORM SEWERS 171 <br /> Water Main Replacement"W" Table of Contents - April 2022 <br /> IWO No.-UP3766 SP -v <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.