Laserfiche WebLink
' CITY OF EVERETT SPECIAL PROVISIONS <br /> complying with these regulations or any other regulations listed above are included in <br /> ' the Contractor's Proposal. <br /> In cases of conflict between different safety regulations, the more stringent regulation <br /> shall apply. <br /> ' The Washington State Department of Labor and Industries shall be the sole and <br /> paramount administrative agency responsible for the administration of the provisions of <br /> the Washington Industrial Safety and Health Act of 1973 (WISHA). <br /> The Contractor shall maintain at the project site office, or other well-known place at the <br /> project site, all articles necessary for providing first aid to the injured. The Contractor <br /> shall establish, publish, and make known to all employees, procedures for ensuring <br /> immediate removal to a hospital, or doctor's care, persons, including employees, who <br /> ' may have been injured on the project site. Employees should not be permitted to work <br /> on the project site before the Contractor has established and made known procedures <br /> for removal of injured persons to a hospital or a doctor's care. <br /> The Contractor shall have sole responsibility for the safety, efficiency, and adequacy of <br /> the Contractor's plant, appliances, and methods, and for any damage or injury resulting <br /> from their failure, or improper maintenance, use, or operation. The Contractor shall be <br /> ' solely and completely responsible for the conditions of the project site, including safety <br /> for all persons and property in the performance of the Work. This requirement shall <br /> apply continuously, and not be limited to normal working hours. The required or implied <br /> ' duty of the Engineer to conduct construction review of the Contractor's performance <br /> does not, and shall not, be intended to include review and adequacy of the Contractor's <br /> safety measures in, on, or near the project site. <br /> Supplement 1-07.1 by adding the following: <br /> 1-07.1(1) Noise <br /> Work within 500 feet of residential properties between the hours of 10:00 p.m. and 7:00 <br /> a.m. during weekdays and between the hours of 6:00 p.m. and 8:00 a.m. on weekends <br /> or holidays are subject to noise control requirements if the work generates decibel levels <br /> of greater than 55 db(A). A variance to the noise ordinance has been obtained for <br /> specific work on this project. A copy of the noise variance letter can be found in Appendix <br /> E. <br /> Typical requirements include, and not limited to, broadband backup alarms on all <br /> equipment requiring a backup alarm, anti-tail gate slamming devices, dump truck bed <br /> liners, and sawcutting, vacuum excavation, pavement breaking and loading export haul <br /> noise must be done between the hours of 7:00 a.m. and 10:00 p.m. during weekdays <br /> and between 8:00 a.m. and 6:00 p.m. on weekends. Appendix E contains the City of <br /> Everett's Noise Ordinance for Bidder's reference. <br /> Approval to continue Work during these hours may be revoked at any time the Contractor <br /> exceeds the City's noise control regulations or complaints are received from the public <br /> or adjoining property owners regarding the noise from the Contractor's operation. The <br /> Contractor shall have no claim for damages or delays should such permission be <br /> revoked for these reasons. <br /> 1-07.2 State Taxes <br /> ' Delete 1-07.2 and substitute the following: <br /> 1-07.2 State Sales Tax <br /> The Washington State Department of Revenue has issued special rules on the State <br /> sales tax. Sections 1-07.2(1) through 1-07.2(3) are meant to clarify those rules. The <br /> Contractor should contact the Washington State Department of Revenue for answers to <br /> ' Water Main Replacement"W" Division 1 —GENERAL REQUIREMENTS April,2022 <br /> WO No.—UP3766 SP—75 <br />