My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022/08/10 Council Agenda Packet
>
Council Agenda Packets
>
2022
>
2022/08/10 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2023 3:15:08 PM
Creation date
8/11/2022 8:45:07 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/10/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett <br />EXHIBIT A <br />SCOPE OF SERVICES <br />Background <br />The City of Everett, Washington (City) has selected BHC Consultants, LLC (BHC) to provide <br />engineering services for the WPCF TFI Bar Screen Upgrades Project. <br />The trickling filter influent (TFI) bar screen vault has two chambers. The east chamber houses a <br />mechanical bar screen to remove debris from the trickling filter influent coming from the primary <br />clarifiers and return flow from the aerated lagoons, and the west chamber is used as a flow <br />control structure which diverts secondary clarifier effluent, in excess of what is discharged <br />through the South End Pump Station (SEPS), to the aerated lagoons. <br />The City desires improvements related to this vault to improve capabilities for maintenance and <br />system reliability Based on the preliminary design conducted by BHC and subsequent <br />preparation of an engineering report, proposed improvements are to include the following: <br />• Addition of a 36-inch bypass pipeline, precast concrete junction box, and isolation <br />gates that will allow isolation of the east compartment for maintenance of the <br />mechanical screen. When bypassing the east compartment, flow will be directed from <br />Diversion Structure 2 to a junction box downstream of the east compartment. <br />• Removing the existing modulating sluice gate in the west compartment and replacing it <br />with a static weir for improved accuracy and reliability in controlling the minimum wet <br />well level at the SEPS necessary to avoid vortexing of the pumps. <br />This scope of services includes design and bid assistance associated with the proposed <br />improvements necessary to prepare bid documents and assist the City with bidding and <br />awarding the project for construction. The original agreement for preliminary design shall be <br />amended to add engineering services for design and bid assistance as scoped herein. <br />Additional work for engineering services during construction will be incorporated as a second <br />amendment to the original agreement later. <br />Scope of Services <br />Task 100 —Project Management <br />Objectives <br />Monitor, control and adjust scope, schedule, and budget as well as provide monthly status <br />reporting, accounting, and invoicing. Also, provide coordination with BHC staff and City <br />personnel. <br />BHC Services <br />1. Coordinate and manage the project team. <br />2 Subcontract with and manage project subconsultants. BHC will subcontract with HWA <br />to review design elements related to excavation/backfill, dewatering, and soil bearing <br />pressures for the new junction box. HWA had prepared the most recent geotechnical <br />report for the WPCF, which looked at the same general area as the proposed <br />improvements. <br />Scope of Services 2 <br />bhc <br />CONSULTANTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.