My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
523 61ST ST SE 2022-08-12
>
Address Records
>
61ST ST SE
>
523
>
523 61ST ST SE 2022-08-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2022 9:43:37 AM
Creation date
8/12/2022 9:43:21 AM
Metadata
Fields
Template:
Address Document
Street Name
61ST ST SE
Street Number
523
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7/1/2022 City of Everett Page 2 15 <br /> 2:09:50PM <br /> INSPECTION ACTIVITY REPORT <br /> 5/21/2020 5/21/2020 PLUMB SDP PARTIAL APPR eTRAKiT Inspection 5/20/2020 1:19 PM BRIAN BODGE <br /> 03-ROUGH IN Request <br /> Contact Name:BRIAN BODGE <br /> Site Address:523 61ST ST SE <br /> Phone:4258793437 <br /> e-Mail:brianbodge@msn.com <br /> (5/21/2020 2:38 PM SDP) <br /> 2"vent pipe in the floor/ceiling-ok to <br /> cover <br /> 5/21/2020 5/21/2020 MECH 04-ROUGH SDP PARTIAL APPR 5/20/2020 1:20 PM BRIAN BODGE <br /> IN <br /> Contact Name:BRIAN BODGE <br /> Site Address:523 61ST ST SE <br /> Phone:4258793437 <br /> e-Mail:brianbodge@msn.com <br /> (5/21/2020 4:13 PM SDP) <br /> Stove Exhaust in floor ceiling ok to cover. <br /> 5/22/2020 5/22/2020 BLDG KMK APPROVAL eTRAKiT Inspection 5/21/2020 4:01 PM BRIAN BODGE <br /> 05-UNDERFLOOR Request -A35 brackets are installed, <br /> -top and bottom chords of new floor joists <br /> have been double checked and nailed, <br /> -new post/column and beam supports under <br /> existing main floor are installed, <br /> -mechanical and plumbing inspections have <br /> been performed and pictures of fixes have <br /> been sent to Sheltie Pons;partial plumbing <br /> is approved for cover;partial mechanical <br /> pending Shellie's approval of pictures <br /> -main floor ceiling/lid drywall has been <br /> destroyed by rain and is going to be <br /> removed and replaced;electrical inspection <br /> can be performed later as all will be visible <br /> upon removal of drywall <br /> Contact Name:BRIAN BODGE <br /> Site Address:523 61ST ST SE <br /> Phone:4258793437 <br /> e-Mail:brianbodge@msn.com <br /> 5/22/2020 Any 5/22/2020 BLDG 04-UFER BDGI APPROVAL eTRAKiT Inspection 5/22/2020 2:44 PM BRIAN BODGE <br /> GROUND Request UFER ground was installed and <br /> tied/bonded to the lateral reinforcement in <br /> the new garage foundation prior to pouring <br /> concrete per request by Kurt Keck during <br /> foundation/footing inspection on <br /> 4/16/2020. Photos of the new UFER <br /> ground were sent to Kurt Keck on <br /> 5/21/2020. This inspection request is <br /> intended to document that this was <br /> accomplished as requested and approved. <br /> Contact Name:BRIAN BODGE <br /> Site Address:523 61ST ST SE <br /> Phone:4258793437 <br /> e-Mail:brianbodge@msn.com <br /> 5/22/2020 2:36 PM BRIAN BODGE <br /> This request is to inspect the subfloor <br /> nailing to the floor joists of the new upper <br /> floor before the upper floor walls are <br /> erected. So that if there are any problems <br /> with the subfloor nailing,the walls do not <br /> have to be removed to fix/repair the <br /> subflooring. <br /> Contact Name:BRIAN BODGE <br /> Site Address:523 61ST ST SE <br /> Phone:4258793437 <br /> e-Mail:brianbodge@msn.com <br /> INSP12 C.CRWSYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.