Laserfiche WebLink
7/1/2022 City of Everett Page 3 5 <br /> 2:09:50PM <br /> INSPECTION ACTIVITY REPORT <br /> 5/26/2020 BLDG 14-OTHER KMK VOIDED(KMK 5/22/2020 2:36 PM BRIAN BODGE <br /> 5/26/2020) This request is to inspect the subfloor <br /> nailing to the floor joists of the new upper <br /> floor before the upper floor walls are <br /> erected. So that if there are any problems <br /> with the subfloor nailing,the walls do not <br /> have to be removed to fix/repair the <br /> subflooring. <br /> Contact Name:BRIAN BODGE <br /> Site Address:523 61ST ST SE <br /> Phone:4258793437 <br /> e-Mail:brianbodge@msn.com <br /> 6/4/2020 6/4/2020 BLDG 13-ROOF BDGI OTHER nail per plan 6/2/2020 6:40 PM BRIAN BODGE <br /> NAILING <br /> Contact Name:BRIAN BODGE <br /> Site Address:523 61ST ST SE <br /> Phone:4258793437 <br /> e-Mail:brianbodge@msn.com <br /> 6/29/2020 6/29/2020 BLDG 14-OTHER KMK OTHER cancelled by 6/26/2020 7:50 AM BRIAN BODGE <br /> contractor Hold-downs have been installed but the <br /> rods are not epoxied into place. Need to get <br /> inspection buy-off on the hold-down <br /> installation before we put exterior sheathing <br /> on main floor as there is still sheet rock <br /> inside the house that make some of the <br /> hold-downs unviewable later. <br /> Contact Name:BRIAN BODGE <br /> Site Address:523 61ST ST SE <br /> Phone:4258793437 <br /> e-Mail:brianbodge@msn.com <br /> 7/27/2020 7/27/2020 BLDG KMK APPROVAL as noted 7/25/2020 11:05 AM BRIAN BODGE <br /> 07-EXTERIOR We need to get the hold-downs inspected <br /> before the first floor sheathing is installed <br /> because there are some areas on the first <br /> floor where the sheetrock is still in place <br /> and the hold-downs will not be able to be <br /> inspected after the first floor sheathing is <br /> installed. <br /> Contact Name:BRIAN BODGE <br /> Site Address:523 61ST ST SE <br /> Phone:4258793437 <br /> e-Mail:brianbodge@msn.com <br /> (7/27/2020 1:20 PM KMK) <br /> Leave soffit area open to inspect insulation <br /> and any mechanical before cover. <br /> 9/15/2020 9/15/2020 BLDG KMK NOT READY Complete plumbing, 9/10/2020 5:06 PM BRIAN BODGE <br /> 08-FRAMING mech,elec see notes <br /> Contact Name:BRIAN BODGE <br /> Site Address:523 61ST ST SE <br /> Phone:4258793437 <br /> e-Mail:brianbodge@msn.com <br /> (9/15/2020 9:07 AM KMK) <br /> Call for plumbing,mechanical,and <br /> electrical rough-in inspections before <br /> building inspection. <br /> 9/15/2020 9/15/2020 BLDG KMK APPROVAL eTRAKiT Inspection 9/10/2020 5:06 PM BRIAN BODGE <br /> 07-EXTERIOR Request <br /> Contact Name:BRIAN BODGE <br /> Site Address:523 61ST ST SE <br /> Phone:4258793437 <br /> e-Mail:brianbodge@msn.com <br /> INSP12 ,RIOV STE <br />