Laserfiche WebLink
• <br /> Plan Check <br /> No : <br /> C 1907 -001 3u1y30, 2019 <br /> Mr. Jeff Heilman <br /> Brian Bodge Development Technician <br /> City of Everett Public Works Department <br /> 3200 Cedar Street, Everett, WA 98201 <br /> Office: 425-257-8810 I Direct: 425-257-8976 <br /> Email Address: jheilman@everettwa.gov <br /> RE: Owner: Bodge <br /> Job Address: 523 61st St SE <br /> Plan Check Number: C1907-001, Building Permit Review Letter <br /> Dear Mr. Heilman, <br /> The city's comments from P/an Check Number:C1907-001, Building <br /> Permit Review Letter, dated July 19, 2019, for the project at 523 61st St <br /> SE have been reviewed and responses addressing the comments are <br /> provided below in this itemized letter. The document you provided was <br /> used for responding to the city's 16 review comments. Two new sets of <br /> construction drawings and two sets of revised beam calculations affected <br /> by the city's requested changes have been provided for the Building <br /> Division with this response. The lateral load analysis remains unchanged. <br /> O52361sTSTSE <br /> Everett,WA 98203 <br /> EED <br /> (L�) 425.879.3437 <br /> AUG 0 5 20i0 <br /> @ brianbodge@msn.com CITY OF E VE R E TT <br /> Permit Services <br /> 1/4�� <br />