My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 8/11/2022 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech Engineering LLC 8/11/2022 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2022 11:17:38 AM
Creation date
8/12/2022 11:16:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
8/11/2022
Council Approval Date
8/3/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
PW3694
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0002205
Total Compensation
$3,509,212.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech Engineering LLC 1/31/2020
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MilWashington State <br /> Department of Transportation <br /> Supplemental Agreement Organization and Address <br /> Number 1 City of Everett Public Works Department <br /> Original Agreement Number 3200 Cedar St,Everett,WA 98201 <br /> EBR-3694 <br /> Phone: 425-257-8800 <br /> Project Number Execution Date Completion Date <br /> BRM-2776(009) 1/31/2020 12/31/2026 <br /> Project Title New Maximum Amount Payable <br /> EDGEWATER BRIDGE $3,509,212 <br /> Description of Work <br /> The existing structure is a functionally obsolete structure that is deficient in both shear and deck design <br /> demand load bearing capacity. The new replacement will be approximately 375 feet long and 49 feet wide. <br /> The bridge facility will have (2) 12-foot lanes, (2) 5-foot shoulders and (2) 6.5-foot sidewalks. <br /> The additional work is to provide Construction Phase Engineering Services. <br /> The Local Agency of City of Everett <br /> desires to supplement the agreement entered in to with Trantech Engineering <br /> and executed on 1/31/2020 and identified as Agreement No. EBR-3694 <br /> All provisions in the basic agreement remain in effect except as expressly modified by this supplement. <br /> The changes to the agreement are described as follows: <br /> Section 1, SCOPE OF WORK, is hereby changed to read: <br /> See Exhibit A Attachment for additional scope of work which include Construction Phase Engineering <br /> Services. <br /> I I <br /> Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days <br /> for completion of the work to read: 12/31/2026 <br /> III <br /> Section V, PAYMENT, shall be amended as follows: <br /> The current contract amount of$1,803,078 is supplemented for an additional $1,706,134 for a new maximum <br /> payable amount of$3,509,212 as presented in Exhibit B <br /> as set forth in the attached Exhibit A, and by this reference made a part of this supplement. <br /> If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate <br /> spaces below and return to this office for final action. <br /> By: Trantech Engineering By: Cassie Franklin. Mayor <br /> Con Itant gnature ,appreningAut drity Signature <br /> <6)/It <br /> DOT Form 140-063 ATT APPROVED AS TO FORM Date <br /> Revised 09/2005 OFFICE OF THE CITY ATTORNEY <br />
The URL can be used to link to this page
Your browser does not support the video tag.