Laserfiche WebLink
Supplement No. 1 — Scope of Work <br /> Edgewater Bridge Replacement <br /> INTRODUCTION <br /> Under the Edgewater Bridge Replacement project,the City of Everett(City)has requested that <br /> TranTech Engineering, LLC's team (Consultant)prepare a supplement to provide professional <br /> services to perform work not included within the original Scope of Services and Construction <br /> Phase Engineering and Construction Management Services. <br /> Additional design phase services provided by one of the TranTech team's members, Perteet, <br /> under Work Elements 1, 4 & 11 consist of additional project management, additional detention <br /> pipe design and coordination, additional pre-ad ready design and coordination, preparation of <br /> pre-ad ready plans, estimate, and specifications for two additional submittals, additional plan, <br /> estimate, and specifications revisions based on comments as requested by the City of Everett <br /> (City),and additional environmental permitting support and assistance as requested by the City. <br /> This Supplement Scope of Services also includes professional services to provide construction <br /> phase engineering design support and construction management services by the Consultant. The <br /> estimated number of working days for the construction phase is 336 working days. <br /> In the following the additional scope of work is described in further detail. <br /> In the following the additional scope of work is described in further detail. <br /> Work Element 1 —Project Management(Supplemented) <br /> Work Element 4—Environmental Permitting (Supplemented) <br /> Work Element 11 —Civil, Roadway &Drainage Design (Supplemented) <br /> The extra services are identified in the detailed Scope of Services below. <br /> SCOPE OF SERVICES DEFINED <br /> Page I 1 <br /> City of Everett—Edgewater Bridge Replacement <br />