My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 8/11/2022 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech Engineering LLC 8/11/2022 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2022 11:17:38 AM
Creation date
8/12/2022 11:16:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
8/11/2022
Council Approval Date
8/3/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
PW3694
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0002205
Total Compensation
$3,509,212.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech Engineering LLC 1/31/2020
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Supplement No. 1 — Scope of Work <br /> Edgewater Bridge Replacement <br /> INTRODUCTION <br /> Under the Edgewater Bridge Replacement project,the City of Everett(City)has requested that <br /> TranTech Engineering, LLC's team (Consultant)prepare a supplement to provide professional <br /> services to perform work not included within the original Scope of Services and Construction <br /> Phase Engineering and Construction Management Services. <br /> Additional design phase services provided by one of the TranTech team's members, Perteet, <br /> under Work Elements 1, 4 & 11 consist of additional project management, additional detention <br /> pipe design and coordination, additional pre-ad ready design and coordination, preparation of <br /> pre-ad ready plans, estimate, and specifications for two additional submittals, additional plan, <br /> estimate, and specifications revisions based on comments as requested by the City of Everett <br /> (City),and additional environmental permitting support and assistance as requested by the City. <br /> This Supplement Scope of Services also includes professional services to provide construction <br /> phase engineering design support and construction management services by the Consultant. The <br /> estimated number of working days for the construction phase is 336 working days. <br /> In the following the additional scope of work is described in further detail. <br /> In the following the additional scope of work is described in further detail. <br /> Work Element 1 —Project Management(Supplemented) <br /> Work Element 4—Environmental Permitting (Supplemented) <br /> Work Element 11 —Civil, Roadway &Drainage Design (Supplemented) <br /> The extra services are identified in the detailed Scope of Services below. <br /> SCOPE OF SERVICES DEFINED <br /> Page I 1 <br /> City of Everett—Edgewater Bridge Replacement <br />
The URL can be used to link to this page
Your browser does not support the video tag.