Laserfiche WebLink
1. None <br /> Deliverables: <br /> 1. Evaluation and analysis of any outstanding change orders and claims. <br /> 2. Preparation of claims initiated by the City. <br /> 3. Close-out activities. <br /> 4. As-constructed plans to the Construction Supervisor. <br /> TASK 14.2 Materials Testing <br /> The CONSULTANT'S sub-contractor will conduct field sampling and testing for the PROJECT <br /> including reporting of test results. <br /> Assumptions: <br /> 1. The CONSULTANT will provide materials sampling, testing, testing equipment, <br /> inspection, and approval for the following PROJECT elements: <br /> a. All field installed materials; <br /> b. High strength bolts; and <br /> c. Rebar/bolt coating. <br /> 2. Inspection of prefabricated components including, but not limited to, signs, signals, <br /> drainage structures, and prestressed girders will be managed by the OWNER. <br /> Deliverables: <br /> 1. Field sampling and testing of materials; <br /> 2. Reporting of materials test results. <br /> OTHER GENERAL ASSUMPTIONS <br /> 1. Work performed under this scope is limited to the hours and fee listed in the Scope and <br /> Budget, Prime and Subconsultant Cost Computations. Any work requested that exceeds <br /> what is shown in the Scope and Budget will be considered EXTRA WORK and will be <br /> added as a Supplement to this Agreement. <br /> 2. Shop drawings, construction and falsework drawings will be reviewed and approved by <br /> the EOR. <br /> Page 112 <br /> City of Everett—Edgewater Bridge Replacement <br />