My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 8/11/2022 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech Engineering LLC 8/11/2022 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2022 11:17:38 AM
Creation date
8/12/2022 11:16:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
8/11/2022
Council Approval Date
8/3/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
PW3694
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0002205
Total Compensation
$3,509,212.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech Engineering LLC 1/31/2020
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. None <br /> Deliverables: <br /> 1. Evaluation and analysis of any outstanding change orders and claims. <br /> 2. Preparation of claims initiated by the City. <br /> 3. Close-out activities. <br /> 4. As-constructed plans to the Construction Supervisor. <br /> TASK 14.2 Materials Testing <br /> The CONSULTANT'S sub-contractor will conduct field sampling and testing for the PROJECT <br /> including reporting of test results. <br /> Assumptions: <br /> 1. The CONSULTANT will provide materials sampling, testing, testing equipment, <br /> inspection, and approval for the following PROJECT elements: <br /> a. All field installed materials; <br /> b. High strength bolts; and <br /> c. Rebar/bolt coating. <br /> 2. Inspection of prefabricated components including, but not limited to, signs, signals, <br /> drainage structures, and prestressed girders will be managed by the OWNER. <br /> Deliverables: <br /> 1. Field sampling and testing of materials; <br /> 2. Reporting of materials test results. <br /> OTHER GENERAL ASSUMPTIONS <br /> 1. Work performed under this scope is limited to the hours and fee listed in the Scope and <br /> Budget, Prime and Subconsultant Cost Computations. Any work requested that exceeds <br /> what is shown in the Scope and Budget will be considered EXTRA WORK and will be <br /> added as a Supplement to this Agreement. <br /> 2. Shop drawings, construction and falsework drawings will be reviewed and approved by <br /> the EOR. <br /> Page 112 <br /> City of Everett—Edgewater Bridge Replacement <br />
The URL can be used to link to this page
Your browser does not support the video tag.