My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 8/11/2022 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech Engineering LLC 8/11/2022 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2022 11:17:38 AM
Creation date
8/12/2022 11:16:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
8/11/2022
Council Approval Date
8/3/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
PW3694
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0002205
Total Compensation
$3,509,212.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech Engineering LLC 1/31/2020
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. The CONSULTANT will assist the CITY with any requests where field construction <br /> modifications or additions require field investigation and the written recommendation of a <br /> professional engineer. This task assumes four(4)modifications or additions. <br /> B. Post Replacement Inventory Inspection: The CONSULTANT will perform an inventory <br /> inspection of the bridge after bridge replacement is completed and will update the <br /> BridgeWorks database with inspection findings. The CONSULTANT will prepare and <br /> input Inspection Report with photographs, and Inventory Report within WSDOT Bridge <br /> Works. <br /> Deliverables: <br /> 1. Post replacement inventory inspection report. <br /> 14.3.4 Record Drawings <br /> The CONSULTANT shall prepare record drawings at the completion of the project. <br /> The CITY will provide Contractor-prepared marked-up drawings, inspector's field <br /> notes, and other available information. The CONSULTANT shall use these materials <br /> to prepare the record drawings. Record drawings shall be prepared in accordance <br /> with the CITY's "Record Drawing Requirements." <br /> Deliverables: <br /> 1. Record Drawings for Engineering Review (11"x17" bond [1 copy]) <br /> 2. Record Drawings for Final Submittal (22"x34"mylar [1 copy]) <br /> 3. Scanned PDF's and native CAD files <br /> Page 115 <br /> City of Everett—Edgewater Bridge Replacement <br />
The URL can be used to link to this page
Your browser does not support the video tag.