My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 8/11/2022 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech Engineering LLC 8/11/2022 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2022 11:17:38 AM
Creation date
8/12/2022 11:16:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
8/11/2022
Council Approval Date
8/3/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
PW3694
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0002205
Total Compensation
$3,509,212.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech Engineering LLC 1/31/2020
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Pre-Construction Meetings: The CONSULTANT will attend one (1) pre-construction <br /> meeting. This may include the general pre-construction meeting with the prime contractor <br /> and subcontractors. The CONSULTANT will prepare a draft agenda and submit draft <br /> notes. The CITY shall finalize the meeting notes. <br /> B. Construction Meetings: The CONSULTANT will attend construction meetings as <br /> requested. This task assumes up to sixteen (16) meetings attended by 2 to 3 staff <br /> depending on the meeting agenda and contractor's schedule of work. The CONSULTANT <br /> will take notes at the meeting and prepare a draft of the notes for the CITY. This task <br /> assumes the CITY will prepare meeting agendas, finalize the draft meeting notes, and <br /> distribute them. <br /> C. Review Selected Shop Drawings: The CONSULTANT will review and recommend <br /> action on selected Contractor materials submittals, and shop drawings, as requested by the <br /> CITY. The effort for this task is for input/support of the review of shop drawings and <br /> materials submittals by the Contractor to the CITY. This task assumes that up to fifteen <br /> (15) submittals will be reviewed. <br /> D. Review Selected Material Submittals: The CONSULTANT will review and recommend <br /> action on selected Contractor materials submittals and material test reports, as requested by <br /> the CITY. The effort for this task is for input/support of the review of materials submittals <br /> by the Contractor to the CITY. <br /> E. Requests for Information (RFIs): At the CITY's request, the CONSULTANT may be <br /> asked to provide assistance to the CITY in answering the Contractor's RFIs. This task <br /> assumed that one hundred(100)RFIs will be reviewed. <br /> F. Load Rating of the New Bridge: The CONSULTANT will perform an inventory load <br /> rating calculations for the structure after work is completed and prepare a load rating report <br /> in the Load Resistance Factor Rating (LRFR) in accordance with the current WSDOT <br /> Bridge Design Manual and AASHTO Manual of Bridge Evaluation. <br /> Assumptions: <br /> 1. The CITY will provide for a materials testing lab for construction. Material testing <br /> services are not included in this Scope of Work. <br /> 2. The CONSULTANT level of effort for Review of Shop Drawings, Material <br /> Submittals, RFI's and Change Orders is limited to hours shown in the fee proposal. <br /> Deliverables: <br /> 1. Shop drawing and material submittal reviews. <br /> 2. Responses to RFIs. <br /> 3. Drawings, calculations, and specifications required for change orders. <br /> 4. Load rating report and calculations. <br /> 14.3.3. Construction Field Support Services <br /> The CONSULTANT shall provide Construction Field Support Services on an "on-call" basis at <br /> the CITY's request during the construction phase of the project. <br /> Page 114 <br /> City of Everett—Edgewater Bridge Replacement <br />
The URL can be used to link to this page
Your browser does not support the video tag.