My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 8/11/2022 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech Engineering LLC 8/11/2022 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2022 11:17:38 AM
Creation date
8/12/2022 11:16:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
8/11/2022
Council Approval Date
8/3/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
PW3694
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0002205
Total Compensation
$3,509,212.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech Engineering LLC 1/31/2020
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Subconsultant will include the HDPE conveyance pipe daylight design located near the <br /> southwest corner of the bridge and perform calculations to be included in the drainage report to <br /> incorporate the new HDPE pipe daylight design that was not part of the original Scope of <br /> Services. Revisions to the plans, opinion of cost, and specifications due to the HDPE conveyance <br /> pipe daylight design will be performed under another subtask of this supplement. <br /> Work Elements: <br /> • Coordination with the City. <br /> • Calculations for HDPE pipe anchors and conveyance. <br /> Deliverables: <br /> • HDPE Pipe anchor and conveyance calcs (to be included in the Drainage Report under <br /> Subtask 11.1 of this scope of services) <br /> 11.4 Pre-Ad Ready Plans and Opinion of Cost <br /> Additional plans and opinion of cost services include two additional Pre-Ad Ready (titled"Pre- <br /> Ad Ready" and"Pre-Ad Ready Rev 1") submittals of the plans, specifications, and opinion of <br /> cost and addressing review comments provided by the City for the Pre-Ad Ready submittal. <br /> Additional services include: <br /> The Subconsultant will revise the plans, specifications, and opinion of cost to incorporate the <br /> additional designs of the detention pipe and HDPE conveyance pipe developed under Subtasks <br /> 16.1 and 16.2 of this Scope of Services and address the City's comments on the Pre-Ad Ready <br /> PS&E submittal. The plans and specifications will be submitted to TranTech to be incorporated <br /> into the rest of both of the Pre-Ad Ready PS&E packages prepared by others. <br /> Work Elements: <br /> • Design: The Subconsultant will revise the drainage and roadway restoration designs as <br /> requested by the City. The drainage design revisions include the detention pipe and <br /> HDPE pipe designs developed under Subtasks 16.1 and 16.2 of this Scope of Services. <br /> The roadway restoration design revisions include updates to the removal and paving <br /> limits,pavement grading, guardrail, channelization, and park restoration. <br /> • Plans: The Subconsultant will revise all civil plans to incorporate the revised designs <br /> listed above. The Subconsultant will provide plans to TranTech to be incorporated into <br /> the 90%PS&E set. <br /> • Specifications: The Subconsultant will all civil Contract Provisions ("Specifications")to <br /> incorporate the revised designs listed above. The Subconsultant will provide special <br /> provisions to TranTech to be incorporated into the 90%PS&E set. <br /> • Internal OA/OC: An internal Subconsultant quality assurance/quality control review of <br /> deliverables will be conducted for each Pre-Ad Ready submittal package, as well as <br /> Page 14 <br /> City of Everett—Edgewater Bridge Replacement <br />
The URL can be used to link to this page
Your browser does not support the video tag.