My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 8/11/2022 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech Engineering LLC 8/11/2022 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2022 11:17:38 AM
Creation date
8/12/2022 11:16:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
8/11/2022
Council Approval Date
8/3/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
PW3694
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0002205
Total Compensation
$3,509,212.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech Engineering LLC 1/31/2020
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Assist City with preparation of JARPA form for final Shoreline Permit review. <br /> Task 11 —Civil,Roadway& Drainage Design <br /> 11.1 Stormwater Analysis (Supplemented) <br /> Additional stormwater design and analysis services include: <br /> Drainage Report <br /> The Subconsultant will prepare an updated draft drainage report incorporating the additional <br /> detention pipe design as requested by the City and the additional design of the HDPE <br /> conveyance pipe daylighting at the southwest corner of the bridge that is out of the original <br /> Scope of Services. The draft drainage report will include the additional detention pipe and <br /> conveyance pipe daylight designs in the following sections: written assessment and summary of <br /> the surface water design features of the project, summary of tables, flow control calculations, <br /> pipe capacity calculations,pipe anchor calculations, and supporting exhibits. <br /> Deliverables: <br /> • Draft Drainage Report at 90%PS&E phase (electronic PDF copy) <br /> • Final Drainage Report <br /> 11.2 Detention Pipe <br /> The Subconsultant will modify the detention pipe location and update calculations to be included <br /> in the drainage report to incorporate the new detention pipe design as requested by the City. <br /> Revisions to the plans, opinion of cost, and specifications due to the detention pipe will be <br /> performed under another subtask of this supplement. <br /> Work Elements: <br /> • Coordination with the City, including preparing alternate design exhibits for coordination <br /> meetings. <br /> • Revisions to calculations for flow control and pipe conveyance. <br /> Deliverables: <br /> • Exhibits detailing alternate locations and sizes of detention pipe (electronic PDF copy) <br /> • Flow control calculations(to be included in the Drainage Report provided under Subtask <br /> 11.1 of this scope of services) <br /> • Pipe conveyance calculations(to be included in the Drainage Report provided under <br /> Subtask 11.1 of this scope of services) <br /> 11.3 HDPE Conveyance Pipe Daylight Design <br /> Page 13 <br /> City of Everett—Edgewater Bridge Replacement <br />
The URL can be used to link to this page
Your browser does not support the video tag.