Laserfiche WebLink
• Assist City with preparation of JARPA form for final Shoreline Permit review. <br /> Task 11 —Civil,Roadway& Drainage Design <br /> 11.1 Stormwater Analysis (Supplemented) <br /> Additional stormwater design and analysis services include: <br /> Drainage Report <br /> The Subconsultant will prepare an updated draft drainage report incorporating the additional <br /> detention pipe design as requested by the City and the additional design of the HDPE <br /> conveyance pipe daylighting at the southwest corner of the bridge that is out of the original <br /> Scope of Services. The draft drainage report will include the additional detention pipe and <br /> conveyance pipe daylight designs in the following sections: written assessment and summary of <br /> the surface water design features of the project, summary of tables, flow control calculations, <br /> pipe capacity calculations,pipe anchor calculations, and supporting exhibits. <br /> Deliverables: <br /> • Draft Drainage Report at 90%PS&E phase (electronic PDF copy) <br /> • Final Drainage Report <br /> 11.2 Detention Pipe <br /> The Subconsultant will modify the detention pipe location and update calculations to be included <br /> in the drainage report to incorporate the new detention pipe design as requested by the City. <br /> Revisions to the plans, opinion of cost, and specifications due to the detention pipe will be <br /> performed under another subtask of this supplement. <br /> Work Elements: <br /> • Coordination with the City, including preparing alternate design exhibits for coordination <br /> meetings. <br /> • Revisions to calculations for flow control and pipe conveyance. <br /> Deliverables: <br /> • Exhibits detailing alternate locations and sizes of detention pipe (electronic PDF copy) <br /> • Flow control calculations(to be included in the Drainage Report provided under Subtask <br /> 11.1 of this scope of services) <br /> • Pipe conveyance calculations(to be included in the Drainage Report provided under <br /> Subtask 11.1 of this scope of services) <br /> 11.3 HDPE Conveyance Pipe Daylight Design <br /> Page 13 <br /> City of Everett—Edgewater Bridge Replacement <br />