Laserfiche WebLink
City of Everettf.WPCF TFi Bar Screen Upgrades <br /> Task 500 — Engineering Services During Construction <br /> To be included later as an amendment to the original agreement. <br /> Task 600 — Additional Services as Requested by the Owner <br /> Objective <br /> This task has been included to cover additional work identified by the City not included in the <br /> Scope of Services. <br /> Fee <br /> The consultant fee estimated for Tasks 100, 300, and 400 only, including subconsultants and <br /> other direct costs (ODCs) is $221,305.00. A detailed breakdown of the fee estimate is attached <br /> and labeled Exhibit B. <br /> Expenses are based on the following Rates: <br /> • Mileage: IRS rate (currently$0.625 per mile) <br /> • Printing: <br /> o B&W 8.5x11: $0.15 per page <br /> o Color 8.5x11: $1.00 per page <br /> Schedule <br /> The schedule lengths for Tasks 100, 300, and 200 are as follows: <br /> • Task 100: Project Management (for Tasks 300 and 400 only) 8 months <br /> • Task 300: Design 6 months <br /> o Task 301: Permitting Assistance 6 months <br /> o Task 302: 50 Percent Design 2 1/2 months <br /> o Task 303: 90 Percent Design 2 % months <br /> o Task 304: Final Construction Bid Documents 1 month <br /> • Task 400: Bid Assistance 2 months <br /> Scope of Services 7 bhc <br />