Laserfiche WebLink
Project:Emma Yule Park <br /> Change Order No. I <br /> Change Order Effective Date:2022-08-10 <br /> EXHIBIT -Description of Changed Work <br /> Change order#1 items are shown and noted in the drawings and are dated 3-10-2021(Permit Set)and <br /> revised 7-28-2022(Change Order 1 Set). <br /> 1. Add: $4,394.00 <br /> Install 1 Storm catch basin type 1L with frame&solid cover at west end of playground in lieu of 1 two- <br /> way storm cleanout(add:$6,919.00)and omit the 12"and 4" perforated polyethylene tubing&coring <br /> of the manhole(deduct$2,525.00).Net add=$4,394.00. <br /> 1. Add: $0 <br /> 81 CY additional excavation and backfill with drain rock for revised stormwater infiltration facility. <br /> 2. Add: $0 <br /> Substitute 3 CB convex frames and grates in lieu of 3 frames&vaned grates(detail 1204). <br /> 3. Add: $2,281.00 <br /> Widen the poured concrete walk along Rucker Ave.from 3'to 5'{160 SF) <br /> 4. Add: $6,403.86 <br /> Extend on-site use of construction fence and portable toilet for 6 months due to delays in the Work <br /> through no fault of the Contractor nor the Owner. <br /> 5. Add: $175.00 <br /> 1 Cotinus coggygria'Purpurea'(Purpleleaf Smokebush)@ 6'ht./BB near southwest portion of the site. <br /> 6. Add: $500.00 <br /> 2 Thuja occidentalis Pyramidalis(Pyramidal Arborvitae) @5'-6' Ht./BB at the southeast property line of <br /> the alley. <br /> 7. Add: $0 <br /> 4 LF of 12"dia.Solid rigid HDPE pipe at catch basins B and catch basin C. <br /> 8. Deduct: $0 <br /> Omit 61 LF of 12"dia.Rigid perforated HDPE Storm sewer pipe between catch basins B and C. <br /> 9. Deduct: $0 <br /> Omit overflow pipe to sanitary sewer <br /> 10. Deduct: $5,000.00 <br /> Omit 123 CY(9972 SF @ 4")of pervious concrete in lieu of 123 CY(9972 SF @ 4")controlled density fill <br /> (CDF)concrete.Include approximately 1"dia. Holes in CDF for drainage to aggregate discharge subbase <br /> (sand)beneath. <br /> 11. Deduct: $3,200.00 <br /> Re-use 185 CY(9972 SF @ 6")of on-site excavated subgrade material(sand)in lieu of importing 185 CY <br /> of aggregate discharge subbase at the playground sub-base.Include deduction for excavation and <br /> export of sand. <br /> Emma Yule Park Change Order No. 1 Page 4 of 5 <br /> Sr\irComman\Pro,Pl.an\P OJEC3 f ILLS\EPA`An YUt MC21-_1,I01.02\Co nsitv12 nor\Charg.Ordcrs\Ch,nge Or der I\2022-09-10—Ein,v Yule Pa[k_Ch,nge Omer i,dc-, <br />