My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RRJ Company LLC 8/17/2022 Change Order 1
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2022
>
RRJ Company LLC 8/17/2022 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 11:31:36 AM
Creation date
8/19/2022 11:31:27 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
RRJ Company LLC
Approval Date
8/17/2022
Council Approval Date
8/10/2022
End Date
3/10/2022
Department
Parks
Department Project Manager
Mark Harrison
Subject / Project Title
Emma Yule Park
Public Works WO Number
PW 2020-064-R1
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0002869
Total Compensation
$5,513.86
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
RRJ Company LLC 4/7/2021
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. Deduct: $0 Project:Emma Yule Park <br /> Change Order No. I <br /> Change Order Effective Date:2022-08-10 <br /> Utilize existing on-site sand and amend it to meet 3-way topsoil specification in lawn and planting bed <br /> areas in lieu of Importing 3-way topsoil. Include deduction for excavation and export of sand. Include <br /> deduction for import of proprietary 3-way topsoil. <br /> 13. Deduct: $0 <br /> Place and spread additional exported subgrade soil to City-owned property at Langus Park as directed <br /> by the Owner. <br /> 14. Deduct: $0 <br /> Relocation and setting of 15 on-site gray-black boulders from the east side of Rucker Ave.to east alley. <br /> Relocate 2 of the boulders as shown in the drawings. <br /> 15. Deduct: $40.00 <br /> Omit painting of the 4 removable galvanized steel bollards. <br /> 16. Deduct: $0 <br /> Omit 4 Thuja occidental's'Techny'(Techny Arborvitae). <br /> 17. No Change: $0 <br /> Move the location of the concrete mow strip along the west edge of the easternmost planting bed along <br /> Colby Avenue <br /> 18. No Change: $0 <br /> Realign southeastern poured concrete pavement to avoid street light junction box and adjust the <br /> location of plant materials in the vicinity. <br /> 19. No Change: $0 <br /> Change the location of 3 benches at the north side of the circular plaza.Redistribute to accommodate <br /> 20. No Change: $0 <br /> Rearrange plants along the east property line as shown in the drawings. <br /> 21. No Change: $0 <br /> Add 270 days to the project time due to delays in the Work through no fault of the Contractor nor the <br /> Owner.Date of substantial completion:9-15-2022, Date of final completion: 10-15-2022. <br /> Total Additions: +$13,753.86 <br /> Total Deductions -$ 8,240.00 <br /> Net Change Order No. 1 Amount: +$ 5,513.86 <br /> END OF CHANGE ORDER 1 <br /> Emma Yule Park Change Order No. 1 Page 5 of 5 <br /> 5 P,RCamnon\ProjPlan\PROJECT FOL ES\EMMA YULE\2021_131O NO 2\Cr>n.MlMarrrt\ChangeOrde,,\Change Order 1\2022.0£1-I0_En,ma Yule Par4_Change Order 1.de,x <br />
The URL can be used to link to this page
Your browser does not support the video tag.