My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Action Target 8/17/2022
>
Contracts
>
Capital Contract
>
Action Target 8/17/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 1:42:37 PM
Creation date
8/19/2022 1:33:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Action Target
Approval Date
8/17/2022
Council Approval Date
7/20/2022
Department
Facilities
Department Project Manager
Josh O'Neill
Subject / Project Title
Police Firing Range Bullet Trap Replacement
Tracking Number
0003457
Total Compensation
$477,516.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 72 00 - 16 <br /> I <br /> 5. PROGRESS AND COMPLETION <br /> 5.1. NOTICE TO PROCEED ' <br /> Following execution of the Contract by the Owner,the Owner or Owner's Representative will give the <br /> Contractor a written Notice to Proceed. Notwithstanding other provisions of the Contract,the Contractor I <br /> shall not be obligated to perform Work,and the Owner will not be obligated to accept or pay for Work <br /> performed by the Contractor or be liable for any Delays,prior to delivery of the Notice to Proceed. The <br /> Owner's knowledge of Work being performed prior to delivery of the Notice to Proceed will not obligate <br /> the Owner to accept or pay for such Work. Contractor waives any and all Contract Claims for an <br /> adjustment of Contract Sum and Contract Time arising out of,or related to,work it performs prior to <br /> receipt of the Notice to Proceed. The Owner may issue partial Notices to Proceed. <br /> 5.2. CONTRACT TIME <br /> 5.2.1. General <br /> TIME IS OF THE ESSENCE IN PERFORMING THE CONTRACT. Failure to complete the I <br /> Project within the contractually specified time may affect other Projects and Owner activities.Contract <br /> Time starts upon the later of the issuance of the Notice to Proceed or a date specified in the Notice to <br /> Proceed. The Contractor shall promptly start the Work as soon as possible after the date of the Notice to <br /> Proceed and shall prosecute the Work so that the various portions of the Project shall be completed in <br /> accordance with the Contract Time period. Contractor shall perform its work at such times and in such <br /> ways that the Work is not damaged by weather such as wind,rain,or snow. Contractor shall correct or <br /> repair at its sole expense any Work damaged by weather,irrespective of whether such damage is covered <br /> by insurance. No portions of the Work where acceptable quality will be affected shall be constructed <br /> while unfavorable conditions exist. By bidding on the Project and executing a Contract to perform the <br /> Work,Contractor agrees the contractually required completion dates are feasible,reasonable,and <br /> achievable for the Contract Sum. Contractor represents that it has considered all factors relevant to its <br /> price and achieving the Completion Dates,including,but not limited to,weather, Site access,labor <br /> conditions and the availability of materials,supplies and Equipment. Compliance with ARTICLE 10. 111 <br /> NOTICE TO OWNER,ARTICLE 12. CONTRACT CLAIMS, and 5.2.2. Construction Schedule <br /> are conditions precedent to a request for,consideration of, and grant of, any extension of Contract Time. <br /> Failure to request a time extension in the manner and in the time required by this section, and the I <br /> Specifications referred to herein,constitutes a waiver by the Contractor of any and all entitlement to an <br /> extension of time and any adjustment of Contract Sum arising out, or related to, such Delay. <br /> 5.2.2. Construction Schedule I <br /> 5.2.2.1 General <br /> Contractor shall submit,update and maintain schedules as required by the Contract Documents. <br /> The Contractor shall provide sufficient material,equipment,and labor to meet the interim milestones, 111 <br /> Substantial Completion,Physical Completion and Completion Dates provided by the Contract <br /> Documents. The Owner allocates its resources to a Contract based on the total time allowed in the <br /> Contract. The Contractor may submit a schedule indicating Completion Date earlier than the end of <br /> Contract Time,but Owner cannot guarantee its resources will be available to meet such schedule. Owner <br /> shall not pay or be liable for any additional compensation if the Contractor is not able to meet a schedule <br /> that indicates a Completion Date earlier than the end of Contract Time. <br /> Failure to schedule Owner furnished or installed materials and Equipment for installation on or after its <br /> planned arrival pursuant to the Owner's contract with the supplier or failure to Notify the Owner of tasks <br /> dependent upon the fact or date of arrival of such Owner furnished materials and Equipment,constitute a <br /> waiver by Contractor of any Contract Claim arising out of or related to the timeliness of the furnishing or <br /> installation of such material and Equipment. All schedules must allow for timely incorporation of any <br /> other's work under separate contract with Owner and for timely incorporation of work provided and i <br /> 00 72 00 - 16 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.