My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Action Target 8/17/2022
>
Contracts
>
Capital Contract
>
Action Target 8/17/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 1:42:37 PM
Creation date
8/19/2022 1:33:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Action Target
Approval Date
8/17/2022
Council Approval Date
7/20/2022
Department
Facilities
Department Project Manager
Josh O'Neill
Subject / Project Title
Police Firing Range Bullet Trap Replacement
Tracking Number
0003457
Total Compensation
$477,516.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 01 25 00 - 3 <br /> ' Police Firing Range Bullet Trap Replacement <br /> the Contractor shall provide suitable, secure storage, and protect from damage, theft, or <br /> other loss until installation. <br /> 1.6 PRODUCT SELECTION <br /> A. GENERAL PRODUCT REQUIREMENTS: Provide products that comply with contract <br /> documents, that are undamaged and, unless otherwise indicated, unused at the time of <br /> installation. <br /> 1. Provide products complete with all accessories, trim, finish, safety guards and <br /> other devices and details needed for a complete installation and for the intended <br /> ' use and effect. <br /> 2. STANDARD PRODUCTS: Where available, provide standard products of types <br /> that have been produced and used successfully in similar situations on other <br /> project. <br /> B. PRODUCT SELECTION PROCEDURES: Product selection is governed by contract <br /> documents and governing regulations, not by previous project experience. Procedures <br /> governing product selection include the following: <br /> 1. PROPRIETARY SPECIFICATION REQUIREMENTS: Where only a single <br /> product or manufacturer is named, followed by"no equal", "no substitution", "or no <br /> exception", provide the product indicated. Advise the City when it is discovered <br /> that the named product is not a feasible solution. <br /> 1.7 SUBSTITUTIONS <br /> A. GENERAL: If the Contractor desires approval of some material or product other than <br /> that specified, he may submit a written request for approval of the substitute item in <br /> accordance with the following requirements. <br /> 1. All such requests shall be submitted in four (4) copies and must be made on the <br /> ' "Substitution Request Form", see Section 00 63 25 Substitution Request Form. <br /> 2. No request for approval will be considered unless submitted in accordance with <br /> this Section. <br /> 3. Final decision as to whether an item is an equal or satisfactory substitution rests <br /> with the Owner. <br /> B. REQUESTS FOR APPROVAL: Every request for approval must state whether the item <br /> offered is an equal or better substitution. Each request for substitution must be <br /> referenced to the related specification section and drawing numbers, and be complete <br /> with product data/drawings, description of methods, technical and other information. If <br /> applicable, include samples showing comparison or physical and other pertinent <br /> characteristics as required to establish equivalence of acceptability for the proposed <br /> application. Where specific a test results are required by the contract documents, the <br /> comparison data for the proposed item shall be based upon the same test methods as <br /> those specified, or they shall be correlated to clearly demonstrate comparability. The <br /> same warranty described for the specified product is required for the substitution. <br /> ' C. DURING BID PERIOD: Request for substitutions will not be considered during the bid <br /> period. <br /> 01 25 00 - 3 SUBSTITUTION PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.