My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Action Target 8/17/2022
>
Contracts
>
Capital Contract
>
Action Target 8/17/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2022 1:42:37 PM
Creation date
8/19/2022 1:33:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Action Target
Approval Date
8/17/2022
Council Approval Date
7/20/2022
Department
Facilities
Department Project Manager
Josh O'Neill
Subject / Project Title
Police Firing Range Bullet Trap Replacement
Tracking Number
0003457
Total Compensation
$477,516.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 33 00 -2 <br /> Police Firing Range Bullet Trap Replacement 1 <br /> B. The Contractor is required to review and approve all shop drawings prior to submitting <br /> to Owner for review. All shop drawings received by Owner shall bear the Contractors <br /> stamp of approval. <br /> C. The Contractor shall provide the number of copies required for use by the contractor plus <br /> three (3)additional copies to be retained by the Owner for all items of work as requested ' <br /> by Owner or as required by the contract documents. The Owner or designee shall review <br /> and return all shop drawings to the Contractor within the specified time but no later than <br /> twenty (20) working days of receipt. The review of the shop drawings by the Owner or <br /> designee is for the limited purpose of checking for conformance with the design concept <br /> as expressed in the Contract documents. The review of shop drawings by the Owner <br /> not conducted for the purpose of determining the accuracy and completeness of other <br /> details such as dimensions, quantities, installation instructions, or equipment <br /> performance, all of which remain the responsibility of the Contractor. Approval of the <br /> shop drawings shall not release the Contractor from responsibility for deviations from the <br /> contract documents. The approval of any shop drawings that substantially deviates from <br /> the requirements of the contract documents shall be evidenced by change order. <br /> 2.2 SAMPLES ' <br /> A. Unless otherwise specifically directed by the Owner, all samples shall be of the precise <br /> article proposed to be furnished. <br /> B. Submit the number of samples that are required to be returned plus two (2) that will be <br /> retained by the Owner. ' <br /> PART 3 - EXECUTION <br /> 3.1 IDENTIFICATION OF SUBMITTALS <br /> A. Consecutively number all submittals. Accompany each submittal with a letter of <br /> transmittal showing the transmittal number, date of transmittal, specifications section or <br /> drawing number to which the submittal pertains, brief description of the material <br /> submitted, and the company name of the originator of the submittal. <br /> B. Maintain an accurate submittal log for the duration of the construction period, showing <br /> status of all submittals. Make the log available to the Owner upon request. <br /> 3.2 COORDINATION OF SUBMITTALS <br /> A. Prior to submittal for Owner review, use all means necessary to fully coordinate all <br /> material, including the following: <br /> 1. Determine and verify all field dimensions and conditions. <br /> 2. Coordinate with all trades and all public agencies. <br /> 3. Secure for and pay all necessary approvals and permits from public agencies <br /> having jurisdiction. <br /> 4. Clearly indicate all deviations from the contract documents. <br /> 01 33 00 - 2 SUBMITTAL PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.