Laserfiche WebLink
1 <br /> City of Everett 01 33 00 - 3 <br /> Police Firing Range Bullet Trap Replacement <br /> B. Unless otherwise permitted by the Owner, make all submittals in groups containing <br /> associated items. The Architect/Engineer may reject partial submittals as not complying <br /> with the contract documents. <br /> ' 3.3 TIMING OF SUBMITTALS <br /> A. Within fifteen (15) calendar days from the notice to proceed, submit a Schedule of <br /> ' Submittals identifying the required submittals, anticipated submittal date of submittals, <br /> requested review schedule and submittals for which the review and approval is critical <br /> to the project schedule. <br /> ' B. Make all submittals far enough in advance of scheduled work to provide required time <br /> for reviews and delivery of materials. Allow thirty (30) days for the Owner's review <br /> following his receipt of the submittal. <br /> C. Costs of delays caused by tardiness of submittals may be back charged as necessary <br /> and shall not be borne by the Owner. <br /> END OF SECTION 01 33 00 <br /> 1 <br /> t <br /> 01 33 00 - 3 SUBMITTAL PROCEDURES <br />