My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tastad Construction 8/18/2022
>
Contracts
>
Capital Contract
>
Tastad Construction 8/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2023 10:39:41 AM
Creation date
8/19/2022 3:26:38 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Tastad Construction
Approval Date
8/18/2022
Council Approval Date
7/20/2022
Department
Facilities
Department Project Manager
Brad Chenoweth
Subject / Project Title
Silver LakeTrail Project
Public Works WO Number
PW-2022-075
Tracking Number
0003458
Total Compensation
$873,705.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Change Order 1 Tastad Construction
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Tastad Construction 6/27/2023 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
573
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICity of Everett 00 7200 - i <br /> I <br /> SECTION 007200 <br /> I GENERAL CONDITIONS <br /> CONTENTS <br /> 1. GENERAL INFORMATION 1 <br /> I1.1 Definitions of Words and Terms 1 <br /> 1.2. Contract Documents 5 <br /> I 2. SPECIFICATIONS AND DRAWINGS 6 <br /> 2.1. Interpretation of Specifications and Drawings 6 <br /> 2.2. Division of Specifications and Drawings 6 <br /> I2.3. Discrepancies in Specifications and Drawings 6 <br /> 2.3.1. Errors and Omissions 6 <br /> 2.3.2. Conflicting Provisions 7 <br /> I2.3.3. Utilities 7 <br /> 2.3.3.1 General 7 <br /> 2.3.3.2 Known Utilities 8 <br /> I2.3.3.3 Service Connections 8 <br /> 2.3.3.4 Unknown Utilities 8 <br /> I 2.4. Submittals 8 <br /> 2.5. Contractor's Copies of Contract Documents 8 <br /> 3. OWNER 9 <br /> I 3.1. General 9 <br /> 3.2. Owner's Representative 9 <br /> 4. CONTRACTOR 10 <br /> I4.1. Contractor's Representative 10 <br /> 4.2. Construction Procedures 11 <br /> I 4.3. Subcontractors 11 <br /> 4.4. Responsibilities 12 <br /> 4.4.1. Subcontractors,Manufacturers and Suppliers 12 <br /> I 4.4.2. Contractor's Employees 12 <br /> 4.4.3. Payment for Labor and Materials 12 <br /> 4.4.4. Attention to Work 13 <br /> I 4.4.5. Safety 13 <br /> 4.4.6. Threats,Intimidation and Harassment Forbidden 13 <br /> 4.4.7. Weapons Forbidden 13 <br /> I 4.4.8. Safety Standards 13 <br /> 4.4.9. Public Safety and Convenience 13 <br /> 4.4.10.Access to Work 14 <br /> I 4.4.11. Emergencies 14 <br /> 4.4.12. Trench Excavation 14 <br /> 4.5. Owner-Contractor Coordination 14 <br /> I <br /> 4.5.1. Service of Notice 14 <br /> 4.5.2. Suggestions to Contractor 15 <br /> I00 7200 - i GENERAL CONDITIONS <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.