My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tastad Construction 8/18/2022
>
Contracts
>
Capital Contract
>
Tastad Construction 8/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2023 10:39:41 AM
Creation date
8/19/2022 3:26:38 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Tastad Construction
Approval Date
8/18/2022
Council Approval Date
7/20/2022
Department
Facilities
Department Project Manager
Brad Chenoweth
Subject / Project Title
Silver LakeTrail Project
Public Works WO Number
PW-2022-075
Tracking Number
0003458
Total Compensation
$873,705.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Change Order 1 Tastad Construction
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Tastad Construction 6/27/2023 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
573
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 1 <br /> 1. GENERAL INFORMATION <br /> ' 1.1 DEFINITIONS OF WORDS AND TERMS <br /> Where used in the Contract Documents,the following words and terms shall have the meanings indicated. <br /> The meanings shall be applicable to the singular,plural,masculine and feminine of all words and terms. <br /> Addenda: Written or graphic instruments issued prior to the opening of Bids that clarify,correct,or <br /> ' change the Bidding Requirements or the proposed Contract Documents. <br /> Additive: A supplemental unit of work or group of bid items,identified separately in the Bid Form,that <br /> may,at the discretion of the City,be awarded in addition to the base Bid. <br /> Alternative or Alternate: One of two or more units of Work or groups of bid items, identified separately <br /> in the Bid Form,from which the City may make a choice between different methods or material of <br /> construction for performing the same Work. <br /> ' Application for Payment:Form acceptable to Owner that Contractor is to use during the course of the <br /> Work in requesting progress or final payments that is to be accompanied by such supporting <br /> documentation as is required by the Contract Documents. <br /> ' Architect:An individual or entity retained by the Owner to be the Owner's representative with regard to <br /> matters of design intent. The terms"Owner's Representative","Engineer"and"Architect"are <br /> interchangeable. <br /> ' Award Date: The date of the formal action by the Everett City Council to accept the lowest responsible <br /> and responsive Bidder for the Work. <br /> Bid: The offer or proposal of a bidder submitted on the prescribed form setting forth the prices for the <br /> Work to be performed. <br /> Bid Form—The form provided to Bidders by the City for submittal of a Proposal or Bid to the City for a <br /> specific project. <br /> Bidder: An individual,partnership, firm,corporation,or joint venture,submitting a Bid. <br /> Bid Opening Date: The date the Everett City Clerk publicly opens and reads the Bids. <br /> ' Call for Bids(Advertisement for Bids): The published public notice soliciting or Bids for Work stating, <br /> among other things,the time,place,and date for receiving and opening the Bids. <br /> Change Order: Reference to Change Order shall include all rights of the Owner and Contractor under <br /> ' ARTICLE 6. CHANGES. <br /> Completion Date: Date on which Project is ready for Final Acceptance. All physical Work,including <br /> Punch List, is complete and Contractor has completed and fulfilled all contractual obligations except any <br /> maintenance of landscaping. Contractual obligations that must be fulfilled prior to achievement of the <br /> Completion Date include,but are not limited to,the Contractor's furnishing all documentation(including <br /> correct,complete and accurate as-built or record drawings)and operation and maintenance manuals and <br /> ' transfer of warranties. <br /> Contract: Agreement signed by the Owner and Contractor(Section 005213). Depending on context, <br /> "Contract"may also refer to the Contract Documents as a whole. Contract Documents are defined in <br /> ' section 1.2 below. <br /> Contract Claim: Any request by the Contractor for additional time or money(adjustment of Contract <br /> Sum or Contract Time)irrespective of the cause or reason for the request. Contract Claims include,but <br /> ' are not limited to,requests by the Contractor for additional time or money due to Extra Work, <br /> inefficiencies,Delays,interferences, and problems with the design. Contract Claim includes,but is not <br /> limited to,claims or requests by Subcontractors for extensions of Contract Time,adjustment of Contract <br /> 00 7200 - 1 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.