My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tastad Construction 8/18/2022
>
Contracts
>
Capital Contract
>
Tastad Construction 8/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2023 10:39:41 AM
Creation date
8/19/2022 3:26:38 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Tastad Construction
Approval Date
8/18/2022
Council Approval Date
7/20/2022
Department
Facilities
Department Project Manager
Brad Chenoweth
Subject / Project Title
Silver LakeTrail Project
Public Works WO Number
PW-2022-075
Tracking Number
0003458
Total Compensation
$873,705.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Change Order 1 Tastad Construction
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Tastad Construction 6/27/2023 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
573
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT <br /> 0001 10 - 2 <br /> 01 42 00 References I <br /> 01 45 00 Quality Control <br /> 01 45 23 Testing and Inspection Services I <br /> 01 50 00 Temporary Facilities and Controls <br /> 01 55 00 Vehicular Access and Parking <br /> 01 57 00 Temporary Controls <br /> 01 61 50 Delivery, Storage, and Handling <br /> 01 72 29 Cutting and Patching <br /> 01 74 19 Construction Waste Management and Disposal <br /> 01 74 23 Final Cleaning <br /> 01 77 00 Closeout Procedures <br /> 01 78 23 Operation and Maintenance Data <br /> 01 78 36 Warranties and Bonds <br /> 01 78 39 Project Record Documents <br /> Facility Construction Subgroup I <br /> DIVISION 2: EXISTING CONDITIONS <br /> 02 00 00 Existing Conditions <br /> 02 05 00 Demolition I <br /> O2 20 00 Assessment—Appendage B <br /> 02 41 16 Structure Demolition <br /> 02 61 00 Contaminated Soil Removal <br /> 02 65 00 Residential Heating Oil Tank Decommissioning <br /> DIVISION 31: Earthwork I <br /> 31 00 00 Earthwork <br /> 31 10 00 Site Preparation <br /> DIVISION 32: EXTERIOR IMPROVEMENTS I <br /> 32 12 16 Asphalt Paving <br /> 32 12 44 Porous Asphalt Pavement <br /> 32 17 00 Pavement Markings and Signing <br /> 32 31 13 Chain Link and Site Fencing <br /> 32 39 13 Site Bollards I <br /> 32 91 13 Soil Preparation <br /> 32 92 23 Hydroseeding & Sod <br /> 32 93 01 Plants <br /> DIVISION 33: UTILITIES I <br /> 33 40 00 Storm Drain Systems <br /> APPENDAGE I <br /> A Stormwater Report <br /> B Health & Safety Work Plan for Removal of Asbestos & Lead I <br /> I <br /> 00 01 10- 2 TABLE OF CONTENTS I <br />
The URL can be used to link to this page
Your browser does not support the video tag.