My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tastad Construction 8/18/2022
>
Contracts
>
Capital Contract
>
Tastad Construction 8/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2023 10:39:41 AM
Creation date
8/19/2022 3:26:38 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Tastad Construction
Approval Date
8/18/2022
Council Approval Date
7/20/2022
Department
Facilities
Department Project Manager
Brad Chenoweth
Subject / Project Title
Silver LakeTrail Project
Public Works WO Number
PW-2022-075
Tracking Number
0003458
Total Compensation
$873,705.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Change Order 1 Tastad Construction
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Tastad Construction 6/27/2023 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
573
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 01 25 00 - 1 <br /> i <br /> SECTION 01 25 00 - SUBSTITUTION PROCEDURES <br /> PART 1 - GENERAL <br /> i <br /> 1.1 GENERAL <br /> A. This Section specifies administrative and procedural requirements governing the <br /> Contractor's selection of products for use in the project, and administrative procedures <br /> for handling requests for substitutions made after award of contract. <br /> 1.2 DEFINITIONS <br /> ' A. Definitions used in this paragraph are not intended to negate the meaning of other terms <br /> used in the contract documents. <br /> 1. "Products" are items purchased for incorporation in the work, regardless of <br /> whether they were specifically purchased for the project or taken from the <br /> Contractor's previously purchased stock. <br /> 2. "Named Products" are products identified by use of the manufacturer's name for a <br /> ' product, including such items as a make or model designation, as recorded in <br /> published product literature, of the latest issue as of the date of the contract <br /> documents. <br /> 3. "Materials" are products that must be substantially cut, shaped worked, mixed, <br /> finished, refined or to otherwise fabricated, processed, or installed to form units of <br /> work. <br /> 4. "Equipment" is defined as a product with operational parts, regardless of whether <br /> ' motorized or manually operated, and in particular, a product that requires service <br /> connections such as wiring or piping. <br /> 5. The terms "equal", "or equal", "or approved equal" and "or approved" are <br /> synonymous. All proposed "equal" products, materials, and equipment must be <br /> approved by the substitution request process. <br /> ' 1.3 QUALITY ASSURANCE <br /> A. SOURCE LIMITATIONS: Provide product of same kind, to fullest extent possible, from <br /> ' a single source. <br /> B. COMPATIBILITY OF OPTIONS: When Contractor is given the option of selecting <br /> between two or more products for use on the Project, the product selected shall be <br /> compatible with products previously selected, even if previously selected products were <br /> also options. <br /> 1 C. NAME PLATES: Except for required labels and operating data, do not attach or imprint <br /> manufacturer's or producer's nameplates or trademark on surfaces of products which <br /> will be exposed to view in occupied spaces or on the exterior. <br /> I <br /> 01 25 00 - 1 SUBSTITUTION PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.