My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tastad Construction 8/18/2022
>
Contracts
>
Capital Contract
>
Tastad Construction 8/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2023 10:39:41 AM
Creation date
8/19/2022 3:26:38 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Tastad Construction
Approval Date
8/18/2022
Council Approval Date
7/20/2022
Department
Facilities
Department Project Manager
Brad Chenoweth
Subject / Project Title
Silver LakeTrail Project
Public Works WO Number
PW-2022-075
Tracking Number
0003458
Total Compensation
$873,705.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Change Order 1 Tastad Construction
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Tastad Construction 6/27/2023 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
573
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> City of Everett 01 25 00 - 6 <br /> G. Substitutions will not be considered if theyare indicated or implied on shopdrawings or <br /> p 9 <br /> other project data submittals, without proper notice shown on Section 00 63 25. <br /> H. WORK-RELATED SUBMITTALS: Contractor's submittal of, and Architect's acceptance <br /> of, shop drawings, product data or samples which indicate work not complying with <br /> requirements of contract documents, does not constitute an acceptable and valid request <br /> for, nor approval of, a substitution. <br /> I. GENERAL CONDITIONS: To this extent this Section is inconsistent with Subsection 8.5 <br /> of Section 007200 General Conditions, the requirement most stringent on the Contractor <br /> governs. <br /> PART 2 - PRODUCTS (Not Used) 1 <br /> PART 3 - EXECUTION (Not Used) ' <br /> END OF SECTION 01 25 00 , <br /> I <br /> 1 <br /> I <br /> 01 25 00 - 6 SUBSTITUTION PROCEDURES I <br />
The URL can be used to link to this page
Your browser does not support the video tag.