My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tastad Construction 8/18/2022
>
Contracts
>
Capital Contract
>
Tastad Construction 8/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2023 10:39:41 AM
Creation date
8/19/2022 3:26:38 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Tastad Construction
Approval Date
8/18/2022
Council Approval Date
7/20/2022
Department
Facilities
Department Project Manager
Brad Chenoweth
Subject / Project Title
Silver LakeTrail Project
Public Works WO Number
PW-2022-075
Tracking Number
0003458
Total Compensation
$873,705.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Change Order 1 Tastad Construction
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Tastad Construction 6/27/2023 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
573
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 25 13 - 2 <br /> I. Due to COVID-19 and in adherence to Mayor Franklin's Directive and Governor Inslee's <br /> Order, Contractors will be allowed to enter the building/construction site individually in <br /> keeping within the social distance guidelines. <br /> 1.6 ADDENDA <br /> A. All addenda released are required to be signed and attached to the bid proposal. <br /> B. Bids proposals with addenda that are not signed shall be considered non-responsive and ' <br /> the bid will be rejected. <br /> C. Questions received during the walk thru shall be emailed to Architectural consultant and <br /> City of Everett Representative and answered as addenda. <br /> D. All other questions or interpretations must be in writing and received by the city no later <br /> than 7 calendar days prior to the bid opening date. <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3 - EXECUTION (Not Used) <br /> END OF SECTION 00 25 13 <br /> i <br /> I <br /> I <br /> I <br /> 00 25 13 - 2 PRE-BID MEETING , <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.