My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tastad Construction 8/18/2022
>
Contracts
>
Capital Contract
>
Tastad Construction 8/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2023 10:39:41 AM
Creation date
8/19/2022 3:26:38 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Tastad Construction
Approval Date
8/18/2022
Council Approval Date
7/20/2022
Department
Facilities
Department Project Manager
Brad Chenoweth
Subject / Project Title
Silver LakeTrail Project
Public Works WO Number
PW-2022-075
Tracking Number
0003458
Total Compensation
$873,705.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Change Order 1 Tastad Construction
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Tastad Construction 6/27/2023 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
573
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . <br /> I <br /> City of Everett 00 41 1$ -2 <br /> 1,;3 ACCEPTANCE I <br /> A. This offer shall be open to acceptance and is irrevocable fOr.45.days from the Bid <br /> closing date. I <br /> b If this Bid is accepted the Owner within the time period stated:above, we will <br /> 1, Execute the Agreement within 14.days of receipt of Notice otAward, <br /> 2: Furnish the required TOO-% payment and 100% performance bonds within <br /> 44 Calendar days of receipt of NOtide cif AWatd in the 'forret:.desdribed in <br /> Contract Documents <br /> 3 Commence Work within seven calendar days.after receipt of Notice to I <br /> Proceedi. <br /> C; Itthis Bid lseecePtedWithin the indicated time,and We failtd 001.1erice theWOrK I <br /> or we fail to provide the required .bonds, the Bid security shall be forfeited as <br /> damages to the Owner by reason of our failure; limited in amount to the lesser of <br /> the face value of the Bid security or the difference between this Bid and the Bid <br /> I <br /> upon'which:Oontract is signed. <br /> D. In the event ourBidienotiaccepted within the time stated above;the required)Bid. <br /> I <br /> Security":wjil be returned to the undersigned, according to the prOVISIOna of the: <br /> Instructions to Bidders, unless a mutually satisfactory arrangernent it made for <br /> its retentiOn and valldity.foranextencled period;oftime, <br /> I <br /> 1..4 b(j..NTRACT'IlIVIE <br /> A. Iftnit Bid isacceptekwe.will: I <br /> 1.. Begin work immediately after receiving Owner's letter of Notice to'Proceed. <br /> and to reach Substantial Completion°within the 'dates required under the <br /> . I <br /> Contract DCOOnienta, . <br /> 2 Agree tor.pay liquidated damages the:City as stated ins the Contract in <br /> event the project is not completed on or before required time periods. <br /> 3. Contract with the Owner using the Contract form provided herewith, on the <br /> terms and conditions contained hareirt to do everything necessary to . <br /> complete the:ConstriittioiTtif•the:project in the allotted time.. <br /> I <br /> 1.5 AppE:N PA <br /> 111 <br /> */.,1t, FoliOWing .Addenda have been received, and the roOdiflOations to the Bici <br /> Documents noted below have been:.considered and all costs are included in the <br /> Bid. " I <br /> Addendum No....,,_.../. ..„....., dated <br /> Addendum No,,,..,,;:7,4r.71:.,.....,....:., dated <br /> 00 44 13 I 2. . • • - • <br /> BlID FORM <br /> I <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.