Laserfiche WebLink
1 <br /> City of Everett 00 4336 - 1 <br /> I <br /> I <br /> SECTION 00 4336 - PROPOSED SUBCONTRACTORS FORM <br /> 1. For heating, ventilation and air conditioning, plumbing (as defined by RCW Chap. <br /> 18.106) and electrical work (as defined by RCW Chap. 19.28), and structural steel <br /> I installation and rebar installation, Bidder MUST either identify itself or Subcontractors in <br /> the chart below. If Bidder believes such work is not part of the Work, Bidder shall write <br /> "NO WORK". <br /> I <br /> 2.Bidder shall not list more than one Subcontractor for each category of Work identified, <br /> unless Subcontractors vary with Bid alternates, in which case the Bidder must indicate <br /> which Subcontractor will be used for which alternate. <br /> 3, Bidder's Bid shall be deemed non- <br /> ' responsive and void if: <br /> A.For heating, ventilation and air conditioning, plumbing, electrical work, structural steel <br /> installation and rebar installation, Bidder fails: (1) to submit as part of the Bid the names <br /> ' of such Subcontractors; (2) to name itself to perform such Work; or (3) to write "No <br /> Work"; or <br /> B. Bidder names two or more Subcontractors to perform the same Work. <br /> I 4.The requirement to name the Bidder's proposed heating, ventilation, air conditioning, <br /> plumbing, electrical, structural steel installation and rebar installation subcontractors <br /> applies only to proposed heating, ventilation, air conditioning, plumbing, electrical, <br /> I <br /> structural steel installation and rebar installation subcontractors who will contract <br /> directly with the general contractor submitting the Bid to the City. <br /> 5. The heating, ventilation and air conditioning, plumbing, and electrical portions of <br /> the chart below must be submitted with the bid proposal or within one hour of the <br /> I <br /> published bid submittal time. <br /> 6. The structural steel installation and rebar installation portions of the chart below <br /> I must be submitted with the bid proposal or within forty-eight hours of the <br /> published bid submittal time. <br /> IType/Scope of Work Name and Address of Subcontractor or Bidder <br /> HEATING <br /> I <br /> Subcontractor, bidder or "no work" MUST be <br /> stated <br /> VENTILATION AND AIR CONDITIONING <br /> ' Subcontractor, bidder or "no work" MUST be <br /> stated <br /> PLUMBING (as described in RCW Chap. <br /> I <br /> 18.106) <br /> Subcontractor, bidder or "no work" MUST be <br /> stated <br /> I <br /> ELECTRICAL (as described in RCW Chap. <br /> 19.28) <br /> Subcontractor, bidder or "no work" MUST be <br /> I <br /> stated <br /> I <br /> 00 4336 - 1 PROPOSED SUBCONTRACTORS FORM <br />